Published June 6, 2024 at 8:00 PM

Updated June 12, 2024

Site work for a water / sewer project in South Bend, Indiana. Completed plans call for site work for a water / sewer project.

Work includes consists of furnishing all labor, insurance, materials, equipment, supplies and services for: modification to existing digester clean gas compression system, including the installation of new compressor, gas piping, valves, system integration, concrete, earthwork, selective demolition, and all other associated work to furnish and install a complete and functioning CNG fueling system at the South Bend Wastewater Treatment Plant Any questions about bidding conditions must be addressed to the Owner in writing no later than June 4, 2024. Electronic bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by an electronic copy of a Bid Bond or Certified Check in the amount of not less than five percent (5%) of the base bid plus any alternates. The City reserves the right to request supplemental information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of prequalified status. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus any alternate(s), the Board will look at the totality of the cost when determining the lowest, responsive and responsible bid. The M/WBE Goals for this Project are a. MBE 0.44 %. b. WBE 1.61 %. General: The Work to be done under this Contract consists offurnishing all labor, insurance, materials, equipment, supplies and services for: Modification to existing digester clean gas compression system, including the installation of compressors, gas piping, valves, flow meters, controls, electrical work, system integration, concrete, earthwork, selective demolition, signage, startup, training, commissioning, and all other associated work to furnish and install a complete and functioning CNG fueling system. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for performing and completing the Work. Sole responsibility for adequacy of plant and equipment. Maintaining the Work area and site in a clean and acceptable manner. Maintaining existing facilities in service at all times except where specifically provided for otherwise herein. Site security and protection offinished and unfinished Work. Repair and restoration of Work damaged during construction Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work ofthis character. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish substantial templates and shop drawings for installation. The project will have a completion date of June 30, 2025

Post-Bid

Water / Sewer

$308,000.00

Public - City

Site Work

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
66
Bidding Soon
1,324
All Active Projects
558
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

3113 Riverside Dr, South Bend, IN

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

CNG Compressor Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.