BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in South Bend, Indiana. Completed plans call for site work for a water / sewer project.

Work includes consists of furnishing all labor, insurance, materials, equipment, supplies and services for: modification to existing digester clean gas compression system, including the installation of new compressor, gas piping, valves, system integration, concrete, earthwork, selective demolition, and all other associated work to furnish and install a complete and functioning CNG fueling system at the South Bend Wastewater Treatment Plant Any questions about bidding conditions must be addressed to the Owner in writing no later than June 4, 2024. Electronic bids must be on the City of South Bend Contractor's Bid for Public Work Form, accompanied by an electronic copy of a Bid Bond or Certified Check in the amount of not less than five percent (5%) of the base bid plus any alternates. The City reserves the right to request supplemental information provided by the bidder, and may also conduct random inquiries of the bidder's current and previous customers regardless of prequalified status. The Board reserves the right to reject any or all bids or to accept a full or partial award of the bid or bids which, in its judgment, will be to the best interests of the City of South Bend. If the Board elects to award the base bid plus any alternate(s), the Board will look at the totality of the cost when determining the lowest, responsive and responsible bid. The M/WBE Goals for this Project are a. MBE 0.44 %. b. WBE 1.61 %. General: The Work to be done under this Contract consists offurnishing all labor, insurance, materials, equipment, supplies and services for: Modification to existing digester clean gas compression system, including the installation of compressors, gas piping, valves, flow meters, controls, electrical work, system integration, concrete, earthwork, selective demolition, signage, startup, training, commissioning, and all other associated work to furnish and install a complete and functioning CNG fueling system. Furnishing of all labor, material, superintendence, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for performing and completing the Work. Sole responsibility for adequacy of plant and equipment. Maintaining the Work area and site in a clean and acceptable manner. Maintaining existing facilities in service at all times except where specifically provided for otherwise herein. Site security and protection offinished and unfinished Work. Repair and restoration of Work damaged during construction Furnishing as necessary proper equipment and machinery, of a sufficient capacity, to facilitate the Work and to handle all emergencies normally encountered in Work ofthis character. Furnishing, installing, and protecting all necessary guides, track rails, bearing plates, anchor and attachment bolts, and all other appurtenances needed for the installation of the devices included in the equipment specified. Make anchor bolts of appropriate size, strength and material for the purpose intended. Furnish substantial templates and shop drawings for installation. The project will have a completion date of June 30, 2025

Post-Bid

Water / Sewer

$308,000.00

Public - City

Site Work

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
141
Bidding Soon
1,380
All Active Projects
618
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 11, 2024

July 11, 2024

img_map_placeholder

3113 Riverside Dr, South Bend, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.