Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Cottleville, Missouri. Completed plans call for the renovation of a educational facility.
St. Charles Community College (referred to as "SCC" or "College" hereinafter) is soliciting proposals for the removal of existing signage, wall repair and repainting, necessary electrical work, fabrication and installation, and freight and delivery of new interior signage in accordance with the specifications, and terms and conditions contained herein. SCC and Design Firm, Arcturis, have developed a comprehensive interior signage plan for the main campus located in Cottleville, Missouri. The signage will meet current ADA code, update messaging and materials, and integrate with current electronic technology. The interior wayfinding signage was designed for ten (10) buildings on the main campus and include the following items: BLD-Building ID Signage DL-Dimensional Letters - Large DLS-Dimensional Letters - Small DN-Dimensional Floor Numbers DR-Building Directory (static) DRDG-Building Directory (digital) FRE-Fire Extinguisher RM-Room Number Sign RML-Room-1 Line RMN-Room Number and Long Name RMNC-Room Number and Name - Changeable RMND-Room Number and Name - Donor RMZ-Room ID RR-Restroom Sign RRO-Restroom Overhead Blade Sign RVB-Room Backer/Vinyl for Glass STN-Suite Letter/Name Sign WFO-Overhead Wayfinding Large - Non-Illuminated and Illuminated Options SYM-Symbol WFS-Wall-Mounted Wayfinding Small - Non-Illuminated and Illuminated Options WMW-Wall-Mounted Wayfinding - Non-Illuminated and Illuminated Options PT-Paper Tray' The bid must be accompanied by a bid bond or check which shall not be less than five percent (5%) of the total bid. No bid will be considered unless it is accompanied by the required guaranty. The bid bond shall ensure the execution of the bid and award by the Successful Bidder. The cost of the bid bond shall be borne by the Bidder. The Successful Bidder shall provide a payment and performance bond for one hundred percent (100%) of the total job cost to ensure SCC of faithful performance of all provisions of the contract, and the satisfactory performance of any equipment required hereunder Phase 1 begins Monday, December 2, 2024, and is to be completed no later than Tuesday, January 10, 2025. Phase 1 includes the following buildings: SCC Main (1-SCM) First and Second Floors Student Center (2-SC) McGuire Hall (5-MH) Technology (6-TB) Conoyer Hall (12-CH) Phase 2 begins Monday, March 3, 2025, and is to be completed no later than Friday, April 4, 2025. Phase 2 includes the following buildings: SCC Main (1-SCM) Third Floor Schnare Library (3-SL) Shook Theater (4-ST) Recreation Center (7-RC) Visual Arts (10-VAB) Life Sciences (11-LS Inquiries, questions, and requests for clarification will be accepted until 9:00 A.M., CDT, on Monday, September 23, 2024. All inquiries pertaining to this Request for Proposal are to be submitted in writing to purchasing@stchas.edu and reference RFP 25-103 in the subject line. SCC retains the right to reject any or all responses, in part or in whole, to request additional information and to waive minor deficiency, technical variance, or immaterial technicality. The College reserves the right, at its sole discretion, to waive any irregularities contained in any response. SCC reserves the right to be the sole determining party as to which responses meet specifications and are in the best interest of SCC.
Award
Educational
$301,860.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2024
December 2, 2024
4601 Mid Rivers Mall Dr, Cottleville, MO
Related To This Project
Cottleville, MO
Bid Date: Jul 01 2021
Cottleville, MO
--
Cottleville, MO
--
Cottleville, MO
--
Cottleville, MO
--
Cottleville, MO
Bid Date: Jun 12 2024
Cottleville, MO
Bid Date: Jun 20 2024
Cottleville, MO
Bid Date: Jun 19 2024
Cottleville, MO
Bid Date: Jun 04 2024
Cottleville, MO
Bid Date: Jul 30 2021
Cottleville, MO
Bid Date: Apr 03 2019
Cottleville, MO
Bid Date: Apr 04 2019
Cottleville, MO
--
Cottleville, MO
Bid Date: May 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.