BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cottleville, Missouri. Completed plans call for the renovation of a educational facility.

St. Charles Community College (referred to as "SCC" or "College" hereinafter) is soliciting proposals for the removal of existing signage, wall repair and repainting, necessary electrical work, fabrication and installation, and freight and delivery of new interior signage in accordance with the specifications, and terms and conditions contained herein. SCC and Design Firm, Arcturis, have developed a comprehensive interior signage plan for the main campus located in Cottleville, Missouri. The signage will meet current ADA code, update messaging and materials, and integrate with current electronic technology. The interior wayfinding signage was designed for ten (10) buildings on the main campus and include the following items: BLD-Building ID Signage DL-Dimensional Letters - Large DLS-Dimensional Letters - Small DN-Dimensional Floor Numbers DR-Building Directory (static) DRDG-Building Directory (digital) FRE-Fire Extinguisher RM-Room Number Sign RML-Room-1 Line RMN-Room Number and Long Name RMNC-Room Number and Name - Changeable RMND-Room Number and Name - Donor RMZ-Room ID RR-Restroom Sign RRO-Restroom Overhead Blade Sign RVB-Room Backer/Vinyl for Glass STN-Suite Letter/Name Sign WFO-Overhead Wayfinding Large - Non-Illuminated and Illuminated Options SYM-Symbol WFS-Wall-Mounted Wayfinding Small - Non-Illuminated and Illuminated Options WMW-Wall-Mounted Wayfinding - Non-Illuminated and Illuminated Options PT-Paper Tray' The bid must be accompanied by a bid bond or check which shall not be less than five percent (5%) of the total bid. No bid will be considered unless it is accompanied by the required guaranty. The bid bond shall ensure the execution of the bid and award by the Successful Bidder. The cost of the bid bond shall be borne by the Bidder. The Successful Bidder shall provide a payment and performance bond for one hundred percent (100%) of the total job cost to ensure SCC of faithful performance of all provisions of the contract, and the satisfactory performance of any equipment required hereunder Phase 1 begins Monday, December 2, 2024, and is to be completed no later than Tuesday, January 10, 2025. Phase 1 includes the following buildings: SCC Main (1-SCM) First and Second Floors Student Center (2-SC) McGuire Hall (5-MH) Technology (6-TB) Conoyer Hall (12-CH) Phase 2 begins Monday, March 3, 2025, and is to be completed no later than Friday, April 4, 2025. Phase 2 includes the following buildings: SCC Main (1-SCM) Third Floor Schnare Library (3-SL) Shook Theater (4-ST) Recreation Center (7-RC) Visual Arts (10-VAB) Life Sciences (11-LS Inquiries, questions, and requests for clarification will be accepted until 9:00 A.M., CDT, on Monday, September 23, 2024. All inquiries pertaining to this Request for Proposal are to be submitted in writing to purchasing@stchas.edu and reference RFP 25-103 in the subject line. SCC retains the right to reject any or all responses, in part or in whole, to request additional information and to waive minor deficiency, technical variance, or immaterial technicality. The College reserves the right, at its sole discretion, to waive any irregularities contained in any response. SCC reserves the right to be the sole determining party as to which responses meet specifications and are in the best interest of SCC.

Award

Educational

$301,860.00

Public - County

Renovation

87

5

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
54
Bidding Soon
871
All Active Projects
347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

December 2, 2024

img_map_placeholder

4601 Mid Rivers Mall Dr, Cottleville, MO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.