Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Ithaca, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
US-127 Ramps at Washington Road, Ithaca, Gratiot Co, PMC The work shall consist of concrete pavement removal and replacement at the following ramp approaches: US-127 NB on ramp, US-127 NB off ramp, US-127 SB off ramp, & US-127 SB on ramp. The dimensions and limits of concrete removal & placement are shown below in the plan sheets, no work will be performed on existing curb and gutter. As shown on plans there will be pavement removal and HMA surface removal with hand patching performed on US-127BR (E Washington Rd). Traffic will be maintained as described in the Maintaining Traffic section contained in this proposal. LOCATION This project takes place on the NB & SB entrance and exit ramps on US-127BR at E Washington Rd in the City of Ithaca, Gratiot County. Location #1 - NB US-127 On Ramp: The work on the NB US-127 On Ramp begins on the north side of E Washington Rd where the material switches from asphalt to concrete and continues northerly approx. 75 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494209 PR MP: 0.0 - 0.014 Location #2 - NB US-127 Off Ramp: The work on the NB US-127 Off Ramp begins on the north side of E Washington Rd to the west of NB US-127 On Ramp where the material switches from asphalt to concrete and continues northerly approx. 100 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494601 PR MP: 0.241 - 0.26 Location #3 - SB US-127 Off Ramp: The work on the SB US-127 Off Ramp begins on the north side of E Washington Rd just west of US-127 overpass where the material switches from asphalt to concrete and continues northerly approx. 80 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0500402 PR MP: 0.164 - 0.18 Location #4 - SB US-127 On Ramp: The work on the SB US-127 On Ramp begins on the south side of E Washington Rd just west of US-127 overpass where the material switches from asphalt to concrete and continues southerly approx. 100 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494401 PR MP: 0.00 - 0.0189 MDOT will have the low bid reviewed and approved for funding. MDOT reserves the right to reject any bid that appears to be unqualified. Before award, MDOT may request a site and plan review meeting with the low bid contractor. The quantities included on the plan sheets and the summations below are approximate and for reference only. Contractor will be responsible for verifying quantities before bidding by site inspection and plan review. If any major discrepancies are noted, contractor must contact Jacob Peterson at (989) 573-0537. The quantities included on the plan sheets and the summations below are approximate and for reference only. Contractor will be responsible for verifying quantities before bidding by site inspection and plan review. If any major discrepancies are noted, contractor must contact Jacob Peterson at (989) 573-0537. This project is a Maintenance funded project, which means that there will be absolutely no overpayment or extras. All material, labor and mobilization shall be included in the bid. Should there be any questions regarding this requirement, contact the MDOT Environmental Services Section at (517) 373-8350. Work may begin immediately after receiving approval from MDOT. Work at all locations must be completed by August 23, 2024. Notice must be provided to Jason Potts at 989-737-0211 Seven (7) calendar days prior to beginning any work. No work shall be performed, or lane closures allowed during the Memorial Day, Independence Day, or Labor Day holiday periods. The Memorial Day holiday period shall be defined as beginning Thursday, May 23rd, 2024 at 3:00 pm until Tuesday, May 28th, 2024 at normal starting time. The Independence Day holiday period shall be defined as beginning Wednesday, July 3rd 2024, at 12:00 pm until Monday, July 8th, 2024, at normal starting time. The Labor Day holiday period shall be defined as beginning Thursday, August 29th, 2024, at 3:00 pm until Tuesday, September 3rd, 2024, at normal starting time Anticipated contract begin date N/A Monday, June 10, 2024 Question Deadline 05/22/2024 at 3:00 PM ET Should there be any questions regarding this requirement, contact the MDOT Environmental Services Section at (517) 373-8350 Bidder questions about this RFP must be emailed to the Solicitation Manager no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on online. Submit questions using the format below; a Microsoft Excel format or similar is suggested. Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State's publicly available website after bidders are notified of the award recommendation. If you wish to initiate a protest of the award, you must submit your written protest to Carol Rademacher at RademacherC@michigan.gov no later than 3:00 p.m., three (3) business days after posting the Award Recommendation and Evaluation Synopsis on SIGMA VSS. The State reserves the right to adjust this timing and will publish any change.
Post-Bid
Sidewalks / Parking Lot
$130,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2024
June 27, 2024
Washington Rd, Ithaca, MI
Related To This Project
Ithaca, MI
Bid Date: Jun 24 2024
Ithaca, MI
Bid Date: Jun 06 2024
Ithaca, MI
Bid Date: Jun 21 2024
Ithaca, MI
Bid Date: Jun 21 2024
Ithaca, MI
Bid Date: Aug 07 2020
Ithaca, MI
Bid Date: Nov 01 2024
Ithaca, MI
Bid Date: Jun 07 2024
Ithaca, MI
Bid Date: May 06 2024
Ithaca, MI
Bid Date: Apr 18 2024
Ithaca, MI
Bid Date: Jul 02 2024
Ithaca, MI
Bid Date: Apr 09 2024
Ithaca, MI
Bid Date: Mar 25 2024
Ithaca, MI
--
Ithaca, MI
Bid Date: Jan 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.