Site work and paving for a mixed-use development in Ithaca, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

US-127 Ramps at Washington Road, Ithaca, Gratiot Co, PMC The work shall consist of concrete pavement removal and replacement at the following ramp approaches: US-127 NB on ramp, US-127 NB off ramp, US-127 SB off ramp, & US-127 SB on ramp. The dimensions and limits of concrete removal & placement are shown below in the plan sheets, no work will be performed on existing curb and gutter. As shown on plans there will be pavement removal and HMA surface removal with hand patching performed on US-127BR (E Washington Rd). Traffic will be maintained as described in the Maintaining Traffic section contained in this proposal. LOCATION This project takes place on the NB & SB entrance and exit ramps on US-127BR at E Washington Rd in the City of Ithaca, Gratiot County. Location #1 - NB US-127 On Ramp: The work on the NB US-127 On Ramp begins on the north side of E Washington Rd where the material switches from asphalt to concrete and continues northerly approx. 75 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494209 PR MP: 0.0 - 0.014 Location #2 - NB US-127 Off Ramp: The work on the NB US-127 Off Ramp begins on the north side of E Washington Rd to the west of NB US-127 On Ramp where the material switches from asphalt to concrete and continues northerly approx. 100 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494601 PR MP: 0.241 - 0.26 Location #3 - SB US-127 Off Ramp: The work on the SB US-127 Off Ramp begins on the north side of E Washington Rd just west of US-127 overpass where the material switches from asphalt to concrete and continues northerly approx. 80 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0500402 PR MP: 0.164 - 0.18 Location #4 - SB US-127 On Ramp: The work on the SB US-127 On Ramp begins on the south side of E Washington Rd just west of US-127 overpass where the material switches from asphalt to concrete and continues southerly approx. 100 feet to the pavement joint on the ramp where the pavement material switches from concrete to asphalt. CS: 29011 PR: 0494401 PR MP: 0.00 - 0.0189 MDOT will have the low bid reviewed and approved for funding. MDOT reserves the right to reject any bid that appears to be unqualified. Before award, MDOT may request a site and plan review meeting with the low bid contractor. The quantities included on the plan sheets and the summations below are approximate and for reference only. Contractor will be responsible for verifying quantities before bidding by site inspection and plan review. If any major discrepancies are noted, contractor must contact Jacob Peterson at (989) 573-0537. The quantities included on the plan sheets and the summations below are approximate and for reference only. Contractor will be responsible for verifying quantities before bidding by site inspection and plan review. If any major discrepancies are noted, contractor must contact Jacob Peterson at (989) 573-0537. This project is a Maintenance funded project, which means that there will be absolutely no overpayment or extras. All material, labor and mobilization shall be included in the bid. Should there be any questions regarding this requirement, contact the MDOT Environmental Services Section at (517) 373-8350. Work may begin immediately after receiving approval from MDOT. Work at all locations must be completed by August 23, 2024. Notice must be provided to Jason Potts at 989-737-0211 Seven (7) calendar days prior to beginning any work. No work shall be performed, or lane closures allowed during the Memorial Day, Independence Day, or Labor Day holiday periods. The Memorial Day holiday period shall be defined as beginning Thursday, May 23rd, 2024 at 3:00 pm until Tuesday, May 28th, 2024 at normal starting time. The Independence Day holiday period shall be defined as beginning Wednesday, July 3rd 2024, at 12:00 pm until Monday, July 8th, 2024, at normal starting time. The Labor Day holiday period shall be defined as beginning Thursday, August 29th, 2024, at 3:00 pm until Tuesday, September 3rd, 2024, at normal starting time Anticipated contract begin date N/A Monday, June 10, 2024 Question Deadline 05/22/2024 at 3:00 PM ET Should there be any questions regarding this requirement, contact the MDOT Environmental Services Section at (517) 373-8350 Bidder questions about this RFP must be emailed to the Solicitation Manager no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on online. Submit questions using the format below; a Microsoft Excel format or similar is suggested. Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State's publicly available website after bidders are notified of the award recommendation. If you wish to initiate a protest of the award, you must submit your written protest to Carol Rademacher at RademacherC@michigan.gov no later than 3:00 p.m., three (3) business days after posting the Award Recommendation and Evaluation Synopsis on SIGMA VSS. The State reserves the right to adjust this timing and will publish any change.

Post-Bid

Sidewalks / Parking Lot

$130,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
80
Bidding Soon
1,178
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 27, 2024

img_map_placeholder

Washington Rd, Ithaca, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.