BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint Leon, Indiana. Completed plans call for site work for a water / sewer project.

The scope of work the removal of the existing Delta bypass valve, purchase, and installation of a new bypass valve. The contractor shall furnish all personnel, equipment, supplies and materials necessary. Prices should include mobilization & de-mobilization, fuel, labor, material, and equipment. Note: Lead time for this bypass valve is expected to be 36 weeks after order acknowledgement. The contractor shall not start construction until new bypass valve and all necessary personnel, equipment, supplies, and materials are onsite and ready for assembly. The contractor shall be required to submit supplied valve to Technical Point of Contact (TPOC) listed below for review prior to purchase. If not reviewed before purchase, the contractor may be financially responsible for valve without repayment by the Government. **************************** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on "View FFP Contract Changes Playbook Here". Estimated construction costs is between $100,000 and $250,000 Bidders will receive an acknowledgment of their question via email, followed by an answer to their question after it has been processed by our technical team. Deadline for all questions via ProjNet will be 29 May 2024 with all questions answered by 31 May 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The contractor shall furnish all personnel, equipment, supplies and materials necessary. Prices should include mobilization & de-mobilization, fuel, labor, material and equipment for fabrication, removal, and replacement of the left bypass valve. The contractor's work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.

Award

Water / Sewer

$265,843.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
33
Bidding Soon
1,134
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

June 14, 2024

img_map_placeholder

10064 Overlook Rd, Saint Leon, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.