Renovation of a water / sewer project in Palm Bay, Florida. Completed plans call for the renovation of a water / sewer project.

Rehabilitation of Treatment Unit No. 3, including associated piping and appurtenances, at the North Regional Water Treatment Plant (NRWTP), located at 1105 Clearmont Street, Palm Bay, Florida, per the Technical Specifications. The work under this project includes, but is not limited to, the following: A. Remove all existing Infilco process equipment and structures, platforms, supports, brackets, piping, valves, and electrical and control components completely from the existing concrete treatment tank. B. Remove cascade aerator enclosure at Treatment Unit No. 1 and install railing. C. Power wash and clean existing concrete treatment tank walls (interior and exterior) and floors to facilitate inspection, various repairs, and application of specified coating systems. D. Repair concrete cracks and/or spalls and abandoned pipe wall penetrations. E. Remove various piping; valves; fittings; brackets; electrical and control conduit, wiring, panels, boxes, tubing, pneumatic components, solenoids, meters, transmitters, and actuators from the exterior of the treatment tank. F. Furnish and install new process equipment and structures, platforms, supports, brackets, piping, valves, and electrical and control components in the existing concrete treatment tank. G. Furnish and install piping; valves; fittings; brackets; electrical and control conduit, wiring, panels, boxes, tubing, pneumatic components, solenoids, meters, transmitters, and actuators on the exterior of the treatment tank. H. Furnish and install a new cascade aerator at Treatment Unit No. 2 with platform and railing, including all piping and appurtenances required. I. Remove and install a new metal door and frame at the Water Treatment Plant laboratory and install additional 75 linear feet of kickplate, including all hardware and appurtenances required. J. Furnish and install a new cascade aerator at Treatment Unit No. 3 with platform and railing, including all piping and appurtenances required. K. Paint and coat all concrete and metal (non-aluminum and stainless steel) surfaces including treatment tank, process equipment, piping, fittings, valves/actuators, brackets/supports, panels and conduit. This includes existing and new pipes serving Treatment Unit No. 3 on the exterior of the treatment tank. Pipes shall be coated from the exterior surface of the tank to the top of the ground, to the end or to 30 feet away from the tank, whichever distance is greater. L. Wash, clean, test and disinfect new process equipment prior to placing treatment unit into service. Project Estimate $2,200,000.00. Bid Bond Amount 5%. Question End Date 6/7/2024 5:00 PM. Insurance Required Yes Substantially Completed within one hundred eighty (180) calendar days after the date when the Contract Time commences to run as provided for in the Notice to Proceed, and Finally completed on the Final Completion Date and ready for final payment in accordance with this Agreement within two hundred ten (210) calendar days after the date when the Contract Time commences to run as provided in the Notice to Proceed.

Bid Results

Water / Sewer

$2,870,000.00

Public - City

Renovation

25

19

7

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
59
Bidding Soon
867
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 26, 2024

img_map_placeholder

1105 Clearmont St NE, Palm Bay, FL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.