Site work and paving for a sidewalk / parking lot in Anchorage, Alaska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Scope of Work consists of relocating existing conduit to new Unistrut installed vertically on Capstan Mooring Dolphins 2, 3 and 4, and the Loading Platform; installing steel pedestrian guardrail, concrete bull rail and chain rail. More particularly, demolishing existing cable tray on Capstan Mooring Dolphin 4 and north side of the Loading Platform; disconnecting existing cable runs at end devices on Mooring Dolphins 2,3, and 4 and the Loading Platform; furnishing and installing vertical Unistrut support members and new fiberglass conduit along Unistrut on mooring Dolphins 2,3, and 4, and the Loading Platform, routing existing cables in the new conduit and reconnect to original landing terminals; furnishing and installing steel pedestrian guardrail along breasting and mooring Dolphins, and chain rail where shown; installing concrete bull rail along breasting and mooring Dolphins where shown. The Contractor shall have substantially completed all work under this Contract within ninety (90) calendar days from the Notice to Proceed and reach Final Completion of all Work under this Contract within 15 calendar days from Substantial Completion. Question Deadline 05/24/2024 at 12:00 PM AKT Requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding forty-five (45) days from the time of the opening. Estimated construction cost: Between: $100,001 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$2,245,916.00

Public - City

Paving, Site Work

14

4

17

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
128
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

200 Anchorage Port Road, Anchorage, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.