BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Hope, British Columbia. Completed plans call for the renovation of a fitness / recreation center.

The fraser valley regional district (Fvrd) Is seeking proposals from contractors with demonstrated capacity, capabilities, and experience to provide professional painting services for the repainting of the poolbasin at the fvrd recreation centre in hope, british columbia (The services). The project entails applying ramuc high build epoxy paint, including a white base coat, black race lines, and a red depth line, to the poolbasin. The total area to be painted encompasses approximately 453m2, comprising 413m2 for the basin walls and floors, 40m2 for the race lines, and 2m2 for the red depth line. Contractors are invited to submit a quotation using the form attached to Schedule A (the Quotation) in accordance with the following specifications: Specifications: 1. Pool Basin Preparation: Ensure that the pool basin is prepared according to the manufacturer's recommendations for surface preparation to facilitate optimal adhesion of the paint. 2. Paint Application: Apply the paint to the pool basin as per the manufacturer's recommendations for coverage. This entails administering two coats of Ramuc High Build epoxy paint, incorporating a white base coat, black race lines, and a red depth line. 3. Cure Time: Allow sufficient time in the project timeline to accommodate the manufacturer's recommended cure time, ensuring the paint sets properly and achieves maximum durability. 4. Provision of Tools and Supplies: Furnish all necessary tools and supplies required for the project in accordance with the manufacturer's recommendations. This includes, but is not limited to, providing appropriate ventilation, personal protective equipment (PPE), basin access equipment, ladders, scaffold, and safeguards to protect surrounding areas and equipment from paint and overspray. 5. Compliance: Ensure that the project complies with all relevant regulations, including those outlined by Workplace Safety and Health authorities. 6. Timeline Sensitivity: The project timeline must be sensitive to allow for the manufacturer's recommended cure time and the timely reopening of the facility within the specified shutdown period. 7. Workmanship Warranty: The project must be accompanied by a warranty for the workmanship, adhering to the guidelines set forth by the manufacturer.

Post-Bid

Fitness / Rec Centers

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
25
Bidding Soon
665
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

July 2, 2024

img_map_placeholder

1005 6 Ave, Hope, BC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.