BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Elko, Nevada. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Schedule I - Rehabilitate Air Carrier Apron (Federal) | This is a federally funded schedule to reconstruct approx15,220 SY of pavement. The work will include removal of 15 inches of P-501 Portland Cement Concrete Pavement, placement of 15 inches of P-401 Asphalt Mix Pavement, pavement markings and miscellaneous items. Schedule II - Rehabilitate Air Carrier Apron (Non-Federal) |This is a locally funded schedule for work within 50 feet of the terminal building face. Work items will include 160 SY of asphalt paving on the apron (similar to Schedule I), 331 SY of 6-inch concrete flatwork (under the jet bridge, for constructability purposes), miscellaneous concrete flatwork, and the replacement of the pedestrian access ramp from the apron to the terminal building. Schedule III - Air Carrier Apron Pavement Maintenance (Federal)| This is a federally funded schedule for 5,200 LF of concrete joint and crack repair. Site Directions: Elko Regional Airport Est. Completion Date: Nov. 15, 2024 Pre-Qualification: Yes Question Deadline May 31, 2024 All questions regarding the bid are to be directed to Dane Hurst, Project Manager, Jviation, a Woolpert Company., 35 South 400 West, St. George, Utah 84790, Ph: (435)574-5313; Fax (435)673-8484, or email dane.hurst@woolpert.com.

Bid Results

Transportation Terminals

$4,599,100.00

Public - City

Paving, Site Work

53

6

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
19
All Active Projects
11
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

975 Terminal Way, Elko, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.