BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Site work and paving for a bridge / tunnel in Northfield, Minnesota. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Update: Phase 1 of Bridge Square includes three component of the final concept plan. The Plaza is a "right-sized" paved area containing the existing Sheldahl Fountain, Civil War Memorial and a potential new vertical element (Gateway icon) to draw visitors into the space. The Green - A large circular space that replaces Water Street, the Green is omni-directional, maximizing its flexibility for the diverse users of Bridge Square and engaging surrounding businesses on all sides. Circulation patterns are similar to current routes. The Terrace - A multiuse space along the riverfront, The Terrace will provide an area for large festivals as well as movable tables and chair for casual daily use. At the edge of the riverbank, a pedestrian promenade will connect Bride Square to the Fifth Street bridgehead. A "slow" bike lane will parallel the pedestrian path through the space. Project is included City of Northfield Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Phase 1 of Bridge Square includes three component of the final concept plan. The Plaza is a 'right-sized' paved area containing the existing Sheldahl Fountain, Civil War Memorial and a potential new vertical element (Gateway icon) to draw visitors into the space. The Green - A large circular space that replaces Water Street, the Green is omni-directional, maximizing its flexibility for the diverse users of Bridge Square and engaging surrounding businesses on all sides. Circulation patterns are similar to current routes. The Terrace - A multiuse space along the riverfront, The Terrace will provide an area for large festivals as well as movable tables and chair for casual daily use. At the edge of the riverbank, a pedestrian promenade will connect Bride Square to the Fifth Street bridgehead. A 'slow'bike lane will parallel the pedestrian path through the space. The project is include in the City's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$7,800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
123
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Multiple Locations, Northfield, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.