BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

The purpose of the project is to ensure the integrity of the SSWRF aeration system. A loss of the aeration piping system, which is an integral part of the activated sludge process, can impact plant capacity and effluent quality, and the ability to meet the District's WPDES effluent permit limits. The project scope includes design and construction to replace the four active 30-inch blower discharge pipe branches from the Blower Generator Building (Bldg. 326) to the 90-inch air header, to replace the 30-inch blower discharge pipe expansion joints inside Building 326, and to replace the 16-inch branch pipe feeding from the air header to Aeration Basin. The impact on the operating budget is unknown. As of February 26, 2025, this project is under construction. The following contracts have been awarded: • S02017D01 (Engineering Services - Blower Branch Pipe Replacement at SSWRF) was awarded to Donohue & Associates, Inc. • S02017D02 (Process Air Header Inspection Phase 4) was awarded to J.F. Ahern Company, Inc. • S02017E03 (Process Air Header End Cap Asbestos Abatement) was awarded to Balestrieri Environmental & Development, Inc. • S02017E04 (Process Air Inspection Phase 3) was awarded to Lee Mechanical, Inc. There were also several on-call contracts that worked under the S02017 project: • TS-2667 Task Order 7 (Preliminary Engineering) – Donohue & Associates, Inc. • TS-2672 Task Order 6 (Process Air Header Inspection Phase 1) – Grunau Company, Inc. • TS-2672 Task Order 8 (Process Air Header Inspection Phase 2) – Grunau Company, Inc. • TS-2649 Task Order 11 (Lead-Based Paint Inspection) – The Sigma Group, Inc. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$2,449,740.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
119
Bidding Soon
1,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

Project location map

To Be Determined, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.