BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Round Lake Beach, Illinois. Completed plans call for the renovation of a multi-residential development.

As of September 26, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Lake County Housing Authority will receive sealed bids for Project named LCHA Beach Haven Elevator Renovation. 730 Golfview Drive, Round Lake Beach, IL 60073 The Contractor shall visit the site and acquaint themselves with all existing conditions as they affect the work specified. All questions concerning this project shall be referred to 1919 Architects 4000 Morsay Drive, Rockford, IL 61107, (815) 229-8222, attention Ron Billy or ron@1919architects.com The work is to be commenced at the time stipulated in the Notice to Proceed, by the contract, and shall be fully complete within One Hundred Twenty (120) calendar days. As actual damages for any delay in completion are impossible to determine, the Contractor and his sureties shall be liable for and shall pay to Lake County Housing Authority (LCHA) the sum of Five Hundred Fifty Dollars ($550.00) as fixed, agreed and liquidated damages for each calendar day of delay until the work is totally completed and accepted by Lake County Housing Authority and its Authorized Representatives (Architect). Any amount of liquidated damages shall be deducted from any final balance owed to the Contractor prior to final payment. See Article 33 of the HUD General Conditions. Bid Bond executed by the bidder and acceptable sureties in an amount of not less than 5% of the base bid shall be submitted with each bid. Failure to submit an acceptable bid bond with the bid will result in the rejection of the bid. Attention is called to the provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages set forth in the bid documents. All Contractors who are awarded construction related contracts must document Affirmative Action to ensure Equal Opportunity in Employment. This documentation is subject to review by the Regional Office of the Department of Labor. As a part of normal contract administration, Lake County Housing Authority is responsible for determining the Contractor's compliance with the Equal Employment Opportunity Clause and Affirmative Action Requirements as well as the Contractor's performance in executing those requirements. All MBE/DBE/WBE Contractors, Subcontractors and Suppliers are encouraged to participate on Lake County Housing Authority projects. Lake County Housing Authority reserves the right to accept or reject any and all bids and to waive any and all technicalities. No bid shall be withdrawn for a period of (90) calendar days subsequent to the opening of the bids without the written consent of Lake County Housing Authority. Bid Guarantee Equal to 5% of the Base Bid in the form of: a. Bid Bond secured by Surety b. Certified Check c. Bank Draft d. U.S. Bonds at par value. Any bid which fails to include any of these items may be considered as a nonresponsive bid. Any questions concerning the bid requirements should be directed to Ron Billy, 1919 Architects, at (815) 229-8222 or ron@1919architects.com.

Bid Results

Multi-Residential

$620,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
101
Bidding Soon
2,122
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

March 11, 2025

img_map_placeholder

730 Golfview Dr, Round Lake Beach, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.