BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a bridge / tunnel in Davenport, Iowa. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Work under this project includes the addition of new fixtures and other lighting accessories in the batting/pitching tunnels at Modern Woodmen Park. A. This Specification and the associated drawings govern furnishing, installing, testing and placing into satisfactory operation the Electrical Systems. B. The Contractor shall furnish and install all new materials as indicated on the drawings, and/or in these specifications, and all items required to make his portion of the Electrical Work a finished and working system. C. Description of Systems shall be as follows: 1. Electrical power system to and including luminaires, equipment, motors, devices, etc. 2. Electrical power service system from the Utility Company to and including service entrance equipment, distribution and metering. 3. Grounding system. 4. Fire alarm system. 5. Security system. 6. Wiring system for temperature control system as shown on the drawings. 7. Wiring of equipment furnished by others. 8. Removal work and/or relocation and reuse of existing systems and equipment. 9. Technology Systems as described in Division 27/28 and on the T-series documents as described in the Suggested Matrix of Scope Responsibility. D. Work Not Included: 1. Telecommunications cabling will be by Division 27, in raceways and conduits furnished and installed as part of the Electrical work. 2. Temperature control wiring for plumbing and HVAC equipment (unless otherwise indicated) will be by other Contractors Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: 1. Construction layout. 2. Installation of the Work. 3. Cutting and patching. 4. Coordination of Owner-installed products. 5. Progress cleaning. 6. Starting and adjusting. 7. Protection of installed construction. 8. Correction of the Work. Provide an electronic copy of the O&M manuals as described below for Architect/Engineer's review and approval. The electronic copy shall be corrected as required to address the Architect/Engineer's comments. Once corrected, electronic copies and paper copies shall be distributed as directed by the Architect/Engineer. At Contractor's written request, electronic copies of Architect's CADD files of the Contract Drawings will be provided by Architect for Contractor's use in preparing submittals. Project Identification: MODERN WOODMEN PARK – BATTING CAGE LIGHTING 1. Project Location: 209 S. Gaines Street, Davenport, IA 52802. C. Architect: Studio 483 Architects, 201 W. 2nd Street, Ste. 608, Davenport, Iowa 52801. 1. Refer questions to Project Manager/Architect: Greg Gowey, AIA Studio 483 Architects 201 W. 2nd Street, Ste. 608 Davenport, IA 52801

Award

Bridges / Tunnels

$33,182.00

Public - City

Outdoor Lighting, Site Work

6

11

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
57
Bidding Soon
1,055
All Active Projects
424
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 3, 2024

July 3, 2024

img_map_placeholder

209 S Gaines St, Davenport, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.