Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a educational facility.

solicitation no.: sca24-21706d-1 school: ps 36 / k036 (sped) k857 (brooklyn) description: elevator modernization / fire alarm replacement / electrical systems design no.: d021706 performance period: 730 continuous calendar days (see page cc-3 and appendix b) liquidated damages: fifteen hundred ($1,500) dollars per continuous calendar day and as set forth in the construction contract page cc-3 and appendix b sca system-generated category: (not to be interpreted as a "bid range") $3,000,001 to $10,000,000 $10,000,001 and above contract administrator: raymond lewis/e-mail: rlewis@nycsca.org. documents available: may 20, 2024 rfi email: rfisca@nycsca.org although this solicitation has been publicly, advertised only contractors that are prequalified with the sca are eligible to submit bids for this project. please remember to use the mandatory naming convention in the subject line of your email when you submit this bid. effective immediately the subject line of all bids must contain the word bid followed by the exact solicitation number followed by the full name of the firm. example of an email subject line would be exactly as follows: bid 24-12345d-1 smith and jones electrical if your bid is not labeled with the email subject line above, exactly as is, it will be rejected. all firms will have the opportunity to attend public bid opening online. please check the sca's website at website and on the home page click on the word "bid" on the lower left hand corner for the bid schedule where you will access the link and conference call information in order to access the bid opening. in your email bid, please send only bid page (appendix a), a scanned image of your bid bond, and wsf form (request for wicks - meps) if applicable. please put the name of the school and borough and the solicitation number in the subject line and save each attachment with the name of the school and borough and the solicitation number in the document name. (e.g., ps 177q; solicitation #: firm name - bid; ps 177q; solicitation #: firm name - wsf (mep); ps 177q; solicitation #: firm name - bid bond.) please make sure that your firm are currently prequalified with the sca. in addition, your firm must be qualified to perform work greater than three million ($3,000,000) dollars if your bid is in excess of $3,000,000 and that your firm has the applicable experience for this scope of work as of the bid opening date and time. as a condition of award under this solicitation, the sca will require the lowest responsive, and responsible bidder and its subcontractors of any tier performing work on this project to become signatory to, and be bound by, the provisions of the project labor agreement (pla). website access firms seeking to submit bids or to obtain the solicitation documents and addenda for this project are directed to do so via our bidset website utilizing the solicitation number above in the format as follow: xx-xxxxxd. insurance see specific contractor-furnished insurance requirements and sca-furnished insurance coverage, builder's risk coverage and deductibles, the owner controlled insurance program (ocip). the ocip manual is available at the following website bid breakdown: upon request, the apparent low bidder for this project will be required to submit to the sca/construction manager its bid breakdown using a project specific template, within seventy-two (72) hours of the bid opening or when requested. phasing exhibit attached, as appendix b to the construction contract is the phasing exhibit for this project. lump sum bid amount: all bid amounts must be in whole dollars only. bidders shall submit a lump sum bid amount in the form attached as appendix a to the construction contract to complete the project within the "performance period" after normal school hours under the conditions specified in the contract documents (as defined in the sca's general conditions dated october 11, 2022) inclusive of the phasing exhibit. bid bond all bonds are being processed via surety 2000 a bid bond along with its power attorney prepared on the form attached to the construction contract as appendix c or a certified check of the bidder for five (5%) percent of the bid amount must accompany the lump sum bid form (appendix a). wicks trade work a "wicks" subcontractor is defined as a subcontractor performing construction work in the hvac, plumbing & gas fitting or electrical trades and (except for hvac) licensed to do business in the city of new york in that trade. the sca has determined that the work under this solicitation involves hvac, plumbing and gas fitting and electrical work. all proposed "wicks" trade subcontractors must be prequalified by the sca. however, said firm must not be "disqualified", "suspended", or "ineligible", at the time of bid opening. therefore, the bidder must include with its bid, and in accordance with the information for bidders section, the names of all its proposed "wicks" trade subcontractors and estimates for each of the trades listed in the previous sentence. the bidder must complete and submit with its bid the "wicks" subcontractor request form. (appendix g). if the bidder intends to perform the "wicks" trade work with its own forces, it must include with its bid, in accordance with the information for bidders section, its name, the trade(s) and an estimate for the trade(s). bidders intending to perform electrical or plumbing work with their own forces must be properly licensed to perform this work in the city of new york. if a bidder intends to perform hvac work with its own forces, it must furnish, upon the sca's request, evidence satisfactory to the sca that it possesses the technical capability to perform the hvac work in accordance with the contract documents. project labor agreement (pla) as a condition of award under this solicitation, the sca will require the lowest responsive, and responsible bidder and its subcontractors of any tier performing work on this project to become signatory to, and be bound by, the provisions of the project labor agreement (pla) newly executed on the 25 th of august, 2020. the pla applies to the work performed under this solicitation and bids must be prepared in compliance with the pla. the pla and its newly issued amendment effective september 5, 2023 can be accessed at our website at the following website, click on project labor agreement, and then see below for project labor agreement covering fiscal years 2021 - 2025. the bidder is required to execute a pla letter of assent (in the form of appendix l to the construction contract) pursuant to which it agrees to become signatory to, and abide by, the provisions of the pla. this pla letter of assent will be issued at the time of the notice of intent to award letter. the bidder must sign and return this document to the sca along with the required construction performance and labor and material payment bonds. failure to submit this pla letter of assent will render the bidder to be non-responsive and therefore, ineligible for award of a contract under this solicitation. questions regarding the current pla should be directed to mayra lopez, director of labor law, at email: mlopez8@nycsca.org or telephone number: (718)472-849 pre-qualification pursuant to the sca's authorizing legislation, contracts will only be awarded to contractors prequalified by the sca. if the bidder is not prequalified at the time of the bid opening its bid will not be accepted. please check all three (3) lists (disqualified, suspended, and otherwise ineligible) when conducting a search to obtain the complete prequalification status of a firm appearing on the sca's website . bidders can ensure their eligibility for contract award by verifying that they are currently prequalified. all inquiries regarding prequalification status should be directed to the sca's prequalification dept. at (718)472-8777. information for bidders please see appendix f information for bidders for information regarding bonds and other important information that must be provided to the sca. nyc financial management system (fms)/pay proceeds/letter of direction new please see item q of the information for bidders on how to enroll in the nyc financial management system. all new and existing vendors/contractors must be currently enrolled in nyc financial management system along with your most recent and/or updated information for payments to be processed effectively. pay proceeds/letter of direction: pay proceeds are the payments made to contractors, subcontractors, suppliers, or other parties involved in a construction project. the letter of direction may specify when and how these proceeds should be paid. please see item q of the information for bidders for additional information. all questions by prospective bidders concerning this solicitation should be directed to rfisca@nycsca.org, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date using the project solicitation number in the subject line as indicated in the following example: rfisca 24-12345d-1 smith and jones construction. please send all questions to rfisca@nycsca.org, however, if you have any additional questions or issues please contact raymond lewis, at e-mail: rlewis@nycsca.org, or at phone number: (718) 472-8367. jacqlin s. narain sr. manager, operations contract administration

Bid Results

Educational

$3,540,600.00

Public - City

Renovation

86

19

6

5

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Lighting, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Subflooring, Underlayment, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Air Barriers, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, HVAC Air Cleaning Devices, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Trenching, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
331
Bidding Soon
5,147
All Active Projects
2,155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

August 6, 2024

img_map_placeholder

2045 Linden Blvd, New York, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elevator Modernization / Fire Alarm System Replacement/ Electrical Systems

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.