BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Barstow, California. Contact the soliciting agency for additional information.

Re: Rfp For Tree Removal Barstow Cemetery District Will Be Accepting Bid Proposals For The Above Referenced Project. Bids Received After This Date And/or Time Will Not Be Accepted And Will Be Returned Unopen To The Sender. The Purpose Of This Project Is To Remove And Dispose Of An Estimated 55 Trees Of Various Sizes And Varieties From The Cemetery Grounds. Key Components Of This Project Include: Remove Trees, Grind All Roots, And Remove Any Debris From The Surrounding Area From The Cemetery Grounds.after Removal The Remnants Of The Tress Must Be Chipped And Distributed In The Rear Of The Property. Additional Chipping Includes Existing Trees That Were Previously Removed And Left At The Back Of The Cemetery Property.removal Of The Trees May Require Existing Markers To Be Photographed In Place, Moved In Order To Remove Roots, Etc. And Replaced Back In Their Original Site, With Care Of Handling And Alignment To Site. All Bids Received By The Deadline Shall Be Reviewed By The General Manager. All Bids Must Include All Requested Scope Of Work, Conform To The Project Standards/specifications And Be Responsive, Accurate, And Cost Reasonable. This Project Is Facilitated By The Mohave Water Agency And Falls Under The Davis-bacon Act, Requiring The Selected Contractor To Register With The California Department Of Industrial Relations And Submit Certified Payroll As Well As All Required Insurance. Barstow Cemetery District Will Select The Contractor To Perform All Work Required And The Contract Will Be Executed Between Barstow Cemetery District And The Winning Contractor. You Are Reminded To Bid Only On Those Items Designated In The Scope Of Work. In The Event The General Manager Should Request Additional Work Or Deletion Of Any Work From The Write-up, Or Should You Feel Additional Work Is Required, Those Items, Along With The Costs, Shall Be Listed On A Separate Piece Of Paper Or Letterhead Stationery And Submitted As A Change Order. All Additional Items Will Be Considered Separately From The Base Bid And Consideration Of Any Changes Will Be Negotiated With The General Manager After The Bid Opening. As A Public, Independent, Self-governed District, Barstow Cemetery District Has The Right To Reject Any And All Bids At Their Sole Discretion. Should You Have Any Questions Or Concerns About Any Of The Items On The Work Write-up, Please Contact The General Manager For Clarification Prior To Bidding. You Are Reminded That Your Bid Should Be Inclusive Of All Taxes, Fees, Permits And All Other Costs. Upon Selection Of The Winning Contractor, Barstow Cemetery District Will Send A Bid Award Notice To The Selected Contractor. The Bid Award Notice Will Advise The Selected Contractor Of The Date, Time, And Location Of The Pre-work Conference That Must Take Place Before Any Work Can Begin. Upon Satisfactory Completion Of The Pre-work Conference, Barstow Cemetery District Will Issue A "Notice To Proceed" Which Must Be Executed By The Selected Contractor As Well.

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
68
Bidding Soon
1,273
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Barstow, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.