BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2024 at 8:00 PM

Updated October 11, 2024

Site work and paving for a mixed-use development in Montesano, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and bridge / tunnel.

The project consists of road maintenance that includes, brushing, culvert installation, ditching, cleaning existing culvert inlets and outlets, grading, shaping and compacting existing surface, purchasing, hauling, spreading and compacting surface rock. Bridge deck and curb replacement on 70-foot span glulam bridge. 4728'20.5"N 12335'35.2"W Directions (From Highway 12): - Take US-101 N toward Aberdeen/Port Angeles for 17.4mi - Take the exit toward City Ctr/Matlock for 0.3mi - Turn left onto W Railroad Ave - Continue onto W Shelton Matlock Rd for 15.0mi - Continue straight onto Matlock-Deckerville Rd for 1.0mi, - Turn right onto W Deckerville Rd for 3.3mi - Continue onto Boundary Rd/W Boundary Road West for 4.7mi - Turn right onto 73700/Cougar Smith Rd for 5.4mi - Turn right onto NF-22/Wynoochee Valley Rd for 14.5mi - Continue straight onto Forest service Rd 2270 for 5.9mi - Turn left onto the end terminal of the 2270 loop and continue for 3.6mi to 4728'20.5"N 12335'35.2"W The estimated cost of the project is $464,449.09 Substantial completion date is September 30, 2024. The project is located at Lat: N 47.4469 deg Long: W123.5506 deg. Awarded company - Olympic Resources $ 480,058

Award

Roads / Highways

$480,058.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
80
Bidding Soon
1,094
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

Project location map

Tiger Tail Road, Montesano, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.