Demolition, site work, paving and new construction of a bridge / tunnel in Shelburn, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Control No. 1900120, 2000734, 2000743, 2002060 Federal/State No. 1900120, 2000734, 2000743, 2002060 PROJECT NO. STP-4877(014) Location Replace Superstructure 048-77-05108 Continuous Reinforced Concrete Slab Sullivan County-on Sr 48 Over Kettle Creek, 0.47 Mile East of Us 41 (Rp 007+0042) Bridge Deck Overlay 048-77-05111 Reinforced Concrete Girder Sullivan County-on Sr 48 Over W Fork Busseron Creek, 3.72 Miles E of Us 41 (Rp 010+0067) Replace Superstructure 048-77-05110 Continuous Prestressed Concrete I-beam Sullivan County-on Sr 48 Over Branch Busseron Creek. 2.05 Miles E of Us 41 (Rp 009+0000) Bridge Deck Overlay 067-42-06661 Prestressed Concrete I-beam Knox County-on Sr 67 Over S Fork Smalls Creek, 1.27 Miles S of Sr 550 (Rp 003+0079) Qualifications: C(B) D(A) E(C) Completion Date: September 25, 2026 DBE Goal: 9.00 Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Pre-Bid Meeting Date: Not Applicable Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 441 - Replace Superstructure and Bridge Deck Overlay - SR 48

Bid Results

Bridges / Tunnels

$3,580,877.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

220

17

8

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
118
Bidding Soon
893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

April 1, 2026

Project location map

IN-48, Shelburn, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.