EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 18, 2025 at 7:00 PM

Updated January 19, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Shelburn, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Control No. 1900120, 2000734, 2000743, 2002060 Federal/State No. 1900120, 2000734, 2000743, 2002060 PROJECT NO. STP-4877(014) Location Replace Superstructure 048-77-05108 Continuous Reinforced Concrete Slab Sullivan County-on Sr 48 Over Kettle Creek, 0.47 Mile East of Us 41 (Rp 007+0042) Bridge Deck Overlay 048-77-05111 Reinforced Concrete Girder Sullivan County-on Sr 48 Over W Fork Busseron Creek, 3.72 Miles E of Us 41 (Rp 010+0067) Replace Superstructure 048-77-05110 Continuous Prestressed Concrete I-beam Sullivan County-on Sr 48 Over Branch Busseron Creek. 2.05 Miles E of Us 41 (Rp 009+0000) Bridge Deck Overlay 067-42-06661 Prestressed Concrete I-beam Knox County-on Sr 67 Over S Fork Smalls Creek, 1.27 Miles S of Sr 550 (Rp 003+0079) Qualifications: C(B) D(A) E(C) Completion Date: September 25, 2026 DBE Goal: 9.00 Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Pre-Bid Meeting Date: Not Applicable Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 441 - Replace Superstructure and Bridge Deck Overlay - SR 48

Bid Results

Bridges / Tunnels

$3,580,877.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

220

17

8

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Field Quality Control Procedures, Temporary Facilities and Controls, Temporary Construction, Temporary Runarounds, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment, Recycling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Machining Equipment, Sawing Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
45
Bidding Soon
626
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

April 1, 2026

img_map_placeholder

IN-48, Shelburn, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.