Site work for a water / sewer project in Plantation, Florida. Completed plans call for site work for a water / sewer project.
**As of November 8, 2024 project was awarded to Harn R/O Systems Inc. but awarded amount is not available.** The City of Plantation ("City") is actively seeking bids from contractors which have at least five (5) years of demonstrated experience in performing installation services of membrane elements in skids for drinking water treatment facilities. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. All Questions May Be Addressed in Writing to Sheri Goodrich, Procurement Agent, 400 NW 73 Avenue Plantation, Florida. Sheri Goodrich Can Be Reached at 954-414-7841, Monday Through Friday, 8:00 Am to 4:30 Pm, Email: Sgoodrich@plantation.org. The City Reserves the Right to Reject Any and All Bids and to Accept the One That is in the Best Interests of the City. East Water Treatment Plant Each skid is composed of 52 vessels (280-in long): 36 vessels (280-in long) on the First Stage, and 16 vessels (280-in long) the Second Stage. The existing skids have 9 rows with 4 pressure vessels on the First Stage and 8 rows with 2 pressure vessels on the Second Stage. 1. Provide labor and equipment for dismantling a total of 52 pressure vessels, including endcaps and permeate J-Bend connectors. 2. Provide labor and equipment for unloading a total of 364 used membrane elements (252 from the 1st Stage and 112 from the 2 nd Stage). Services shall also include labor to transport removed membrane elements to a designated disposal dumpster located on-site at the East Water Treatment Plant. 3. Provide labor and materials to swab (with a mild chlorine solution and rinse with clean permeate water) and install a total of 52 pressure vessels and a total of 104 endcaps and JBends. 4. Provide labor and equipment to unload and load a total of 364 new membrane elements (252 for the 1st Stage and 112 for the 2 nd Stage). a) Contractor shall record serial numbers and loading position for the membrane elements and should provide copy of the documentation to the City upon completion of the Work. b) Services shall also include labor to transport removed membrane packaging to a designated disposal dumpster located on-site at the East WTP. Central Water Treatment Plant Each skid is composed of 75 vessels (320-in long): 50 vessels (320-in long) on the First Stage, and 25 vessels (320-in long) the Second Stage. The existing skids have 10 rows with 5 pressure vessels on the First Stage and 5 rows with 5 pressure vessels on the Second Stage. 1. Provide labor and equipment for dismantling a total of 75 pressure vessels, including endcaps and permeate J-Bend connectors. 2. Provide labor and equipment for unloading a total of 525 used membrane elements (350from the 1st Stage and 175 from the 2nd Stage). Services shall also include labor to transport removed membrane elements to a designated disposal dumpster located on-site at the Central Water Treatment Plant. 3. Provide labor and materials to swab (with a mild chlorine solution and rinse with clean permeate water) and install a total of 75 pressure vessels and a total of 150 endcaps and JBends. 4. Provide labor and equipment to unload and load a total of 525 new membrane elements (350 from the 1st Stage and 175 from the 2nd Stage). Contractor shall record serial numbers and loading position for the membrane elements and should provide copy of the documentation to the City upon completion of the Work. Services shall also include labor to transport removed membrane packaging to a designated disposal dumpster located on-site at the Central WTP.
Award
Water / Sewer
$96,915.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2024
October 10, 2024
Multiple Locations, Plantation, FL
Related To This Project
Plantation, FL
Bid Date: Jun 21 2024
Plantation, FL
Bid Date: May 30 2024
Plantation, FL
--
Plantation, FL
Bid Date: Jun 14 2024
Plantation, FL
Bid Date: Jul 12 2024
Plantation, FL
Bid Date: Jul 30 2024
Plantation, FL
Bid Date: Aug 28 2024
Plantation, FL
Bid Date: Aug 13 2024
Plantation, FL
--
Plantation, FL
Bid Date: May 21 2024
Plantation, FL
--
Plantation, FL
Bid Date: May 10 2024
Plantation, FL
Bid Date: May 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.