Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in Tollhouse, California. Completed plans call for the renovation of a fire / police facility.
Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and prepare surface for installation of 2,140 square feet (sq ft) of new commercial grade Luxury Vinyl Plant (VLP) and 356 foot (ft) of 6 inch (in) commercial grade vinyl baseboard for Fresno-Kings Unit Tollhouse Fire Center (FKU). All materials shall be approved by the CAL FIRE Project Manager prior to installation delivery, set up, installations, disassembling, and disposal is included. The DVBE Participation Program applies, and a three percent (3%) goal is required for this IFB. The DVBE Incentive Program may also apply to this IFB. See Section D, Special Programs, Item 1, in this IFB for requirements. As required by Executive Order S-02-06, the California Department of Forestry and Fire Protection (CAL FIRE) is committed to meeting the State's 25 percent (25%) Small Business (SB) participation goal. Certified SBs, Micro Businesses (MB), and contractors willing to commit to subcontracting a minimum of 25 percent (25%) of their net bid price to certified SBs or MBs (if applicable);are encouraged to submit bids. Written Question Submittal May 31, 2024 05:00 p.m. This contract requires Prevailing Wages if the total bid amount exceeds $1,000.00. If the total bid amount is under $1,000.00, then Prevailing Wage language will be removed prior to award. Refer to Sample Standard Agreement, for requirement details. In the opinion of California Department of Forestry and Fire Protection (CAL FIRE), this IFB is complete and without need of explanation. However, if you have questions, or should you need any clarifying information, the contact person for this IFB is: Gilbert Delpasen California Department of Forestry and Fire Protection (916) 894-9833 Gilbert.delpasen@fire.ca.gov. Payment Bond (STD 807) Requirement: If the successful bidder's bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the CAL FIRE representative not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies CAL FIRE may have. Inadequate or lack of a Payment Bond does not negate the Contractor's obligations under this Agreement.
Bid Results
Fire / Police
$23,500.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2024
June 30, 2024
27444 Tollhouse Rd, Tollhouse, CA
Related To This Project
Tollhouse, CA
Bid Date: Jul 15 2024
Tollhouse, CA
--
Tollhouse, CA
--
Tollhouse, CA
Bid Date: Mar 20 2023
Tollhouse, CA
Bid Date: Feb 27 2023
Tollhouse, CA
Bid Date: Jul 15 2020
Tollhouse, CA
Bid Date: Dec 07 2022
Los Angeles, CA
--
San Francisco, CA
Bid Date: Jun 26 2024
Livingston, CA
Bid Date: Jun 11 2024
San Diego, CA
Bid Date: Jun 14 2024
Waterford, CA
Bid Date: Jun 12 2024
Redding, CA
Bid Date: Jun 21 2024
Carlsbad, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.