BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work for a playground / park / athletic field in York, South Carolina. Completed plans call for site work for a playground / park / athletic field.

1. The Contractor assumes all responsibilities for project delivery. 2. Construction Dates - Finish on or before August 15th 2024. 3. No rain days will be allocated to the project duration. 4. Liquidated damages will be $500 per day past the deadline. 5. The Contractor can visit the project site by scheduling an appointment with the owner. 6. Contractor shall develop and submit prior to beginning construction, a schedule of work, which will allow construction of the project while maintaining vehicular access to all adjacent parcels during the construction period. 7. Contractor to clean and scrape all courts removing all dirt, debris, loose court material, and any other matter, pressure wash all areas and dispose of waste in approved location. 8. Contractor spray for weeds and vegetation inside the cracks and on the court surface. 9. Contractor to remediate all birdbaths over 1/8" of water accumulation with approved patching material. 10. All court surfacing products shall be applied per manufacturer specifications. 11. Court colors are to be similar to the existing court colors. 12. Owner shall have final approval of all colors. 13. All net posts shall be sanded and repainted with black enamel paint. 14. The new court lines must meet USTA and National Federation of High School Rules 15. All cracks must be cleaned and filled with manufacturer approved acrylic crack filler and repaired in the court surface. Riteway, Guardian and Armor crack repair products/systems can be accepted, as long as the surfacing manufacturer and installation contractor approves the application of the crack repair manufacturer products. 16. Sand filled acrylic resurfacer must be applied to the entire court system in two layers. 17. Sand filled color coatings will be applied in two colors with two layers over the entire court. 18. The Courts will be lined off to USTA standards with two coats of clearcoat to help prevent fuzzy lines and two white coats textured to match the new surface. 19. Reinstall all tennis nets. 20. Review all specifications as listed in the bid document. Resurface tennis courts at York Comprehensive High School Pre-bid questions 05/29/2024 at 3:00 PM ET

Occupancy

Playgrounds / Parks / Athletic Fields

$130,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
167
Bidding Soon
1,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

July 15, 2024

Project location map

275 Alexander Love Hwy, York, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.