BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Shawnee, Oklahoma. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This section of Woodland Road is 1.2 miles in length and designated as a future arterial road. The existing road either does not yet exist or is a narrow asphalt ditch section roadway, with a typical 22 foot wide asphalt surface. This project will require floodplain study and new alignment for a bridge structure over the western tributary to Mill Creek. Some of the new roadway may be considered for a Green Collector and some will have curb and gutter. ROW cost, existing rock, and steep topography of the area will limit the effective use of ditches. This project will include grading, widening, new asphalt, new curbs when required to control drainage, a shared use path on one side, streetlights, and storm drainage facilities. The Capital Improvement Plan (CIP) for FY 2025-2029 was heard for the last time before being approved by the Board of Shawnee City Commission at a meeting held on Monday, June 17. Many projects that have been on citizens’ minds were addressed in the plan, and they are now on a timeline. The largest budgeted projects are set to begin under the FY 2025 budget. As of June 25, 2024, project is funded for construction starting January 1, 2027 and completed January 31, 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$13,200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
61
Bidding Soon
714
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2027

img_map_placeholder

N Woodland Ave, Shawnee, OK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.