Site work for a golf course in McPherson, Kansas. Completed plans call for site work for a golf course.

The following is a summary of the work for the Project: 1. Mainline Irrigation Piping Approximately 25,000 linear feet 4" to 12" in diameter, buried to a depth of 30" from top of pipe, or as noted, High density polyethylene pipe (HDPE), to be installed via track type or rubber tire 150hp (minimum horsepower) trencher. 2. Lateral Irrigation Piping Approximately 77,000 linear feet 2" diameter buried to a depth of 18" from top of pipe, High density polyethylene pipe (HDPE), to be installed via 80hp rubber tire/track vibratory plow. 3. Mainline Isolation Valves Push on style with restraints, fusion bond epoxy coated ductile iron body resilient wedge gate valves on the large diameter pipe (4"-10") and fusion bond epoxy coated ductile iron body EPDM valve seal. 4. Control System Rainbird 2-Wire control system connected to a new central control software package and weather station. 5. Approximate Sprinkler Quantity 1,460 golf body sprinklers, 79, block zone sprinklers, 38 spray zone sprinklers, (21) 1.5" electric valves, and (22) quick couplers. 6. Pump Station Replace the existing pump station with a new Watertronics pump station. The existing wet well and slab can be re-used. A new intake pipe and screen will be constructed prior to the installation of the irrigation system. Bid Bonds: Each bid must be accompanied by a Bid Bond (or cashier's or certified check) payable to the OWNER for five percent (5%) of the total amount of the bid. As soon as the bid prices have been compared, the OWNER will return the bonds of all except the three lowest responsible BIDDERS. When the Agreement is executed the bonds of the two remaining unsuccessful BIDDERS will be returned. The Bid Bond of the successful BIDDER will be retained until the Statutory bond and Performance bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of the Bid Bond. Performance & Statutory Bonds: A Performance Bond and a Statutory Bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Notice of Award: The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance bond and Statutory bond within ten (10) calendar days from the date when Notice of Award is delivered to the BIDDER. The Notice of Award shall be accompanied by the necessary Agreement and bond forms. In case of failure of the BIDDER to execute the Agreement, the OWNER may at his option consider the BIDDER in default, in which case the Bid Bond accompanying the proposal shall become the property of the OWNER. Notice to Proceed: The Notice to Proceed shall be issued within ten (10) days of the execution of the Agreement by the OWNER. Should there be reasons why the Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between the OWNER and successful BIDDER. If the Notice to Proceed has not been issued within the ten (10) day period or within the period mutually agreed upon, the successful BIDDER may terminate the Agreement without further liability on the part of either party. Rejection of Bidder: The OWNER may make such investigations as he deems necessary to determine the ability of the BIDDER to perform the work, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right in its sole and absolute discretion, to reject any bid if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Unbalanced bids shall be cause for rejection of a bid. Question Deadline 06/14/2024 at 3:00 PM CT Project Coordinator is: Wayne Burns Address: Director of Public Lands and Facilities P.O. Box 1008 McPherson, KS 67460 Phone: (620) 245-2535 Fax: (620) 245-2549 Project substantial completion September 19, 2025 The contract will be completed in 180 working days with the early start date being the date of the fully executed contract, and a late start date of 3/17/2025

Post-Bid

Golf Course

$520,000.00

Public - City

Site Work

11

6

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
37
Bidding Soon
415
All Active Projects
169
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2024

August 12, 2024

September 19, 2025

img_map_placeholder

1000 Fox Run Rd, McPherson, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.