This is a service / maintenance or supply contract in Hayward, California. Contact the soliciting agency for additional information.
Question Submission Deadline: May 28, 2024, 5:00pm The total project cost is estimated to be between $400 million and $500 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Annual General Fund Budget: $123,524 M Annual City Capital Budget: $106 M The purpose of the Wastewater Rates Study is to recommend Wastewater rate structures that will fully recover operating costs and maintenance of the Wastewater system infrastructure, maintain adequate Wastewater Enterprise Fund balances, and comply with all applicable laws and regulations, including Proposition 218, which requires that property-based fees not exceed the cost of providing service. The purpose of the connection fee study is to recommend fees that will ensure that new development fairly and adequately contributes to the cost of existing and planned infrastructure. The intent of this project is to prepare a Cost of Service for the City's Wastewater Enterprise and a recommended five-year schedule of Wastewater service fees. The recommended rates must equitably distribute the costs of providing service to all customer classifications, and comply with all applicable laws and regulations, including Proposition 218. This project will also develop a ten-year Financial Plan for the Wastewater Enterprise Fund. In addition, the Consultant will review and make recommendations for Wastewater connection fees. Scope of Work Task 1 - Project Management Provide overall project management and quality control to ensure that all tasks are fully completed within the allocated budget and time frame. Coordinate a project 'kick-off' meeting. Plan and coordinate bi-monthly project update communications with City staff. Coordinate project meetings and workshops with City staff as needed (telephone, virtual, and/or in-person meetings). Communicate and consult regularly with project core City staff. Attend and/or present at meetings with City staff as needed. Assume two City Council meetings (work session and public hearing). Prepare monthly billings with appropriate cost information summary, including a narrative of services provided and remaining budget for each task. Task 1 Deliverables: Meeting agendas, minutes, and lists of identified action items Meeting presentation materials and handouts Progress reports and invoices Task 2 - Develop Recommended Wastewater Connection Fee Update Evaluate the current capacity connection fee methodology and make recommendations for any changes. Based upon input from City staff and engineers, determine the capacity of infrastructure required by existing customers and capacity available for growth. Prepare a draft report that documents the Wastewater connection fees results, including a description of the methodology, findings, cost allocations, recommended Wastewater fees and the nexus between services provided and benefits from those services. Incorporate City comments and prepare final report. Task 2 Deliverables: Comprehensive Technical Memorandum that documents cost allocations and basis for Wastewater connection fees Wastewater connection fees survey comparing the City proposed fees to those of other Wastewater purveyors Presentation materials including graphs, tables, and text to explain the process and recommended Wastewater connection fees to the Hayward City Council Excel-based rate model and training for City staff Draft and Final Reports Task 3 - Develop Recommended Schedule of Wastewater Service Fees Conduct a thorough review of the Wastewater operating and replacement budgets, current rate structure, and customer usage data. Identify additional data needed to complete the scope of work. Develop recommended wastewater service fees. Develop recommended component rates for volume, carbonaceous biochemical oxygen demand (CBOD) and suspended solids (SS). Develop schedule of recommended residential fees, including the City's current economy and lifeline rates, based on the cost per hundred cubic feet of water consumed. Develop a five-year schedule of rates for each customer classification that: Incorporates best practices Wastewater rates, and complies with all legal requirements, including requirements of Proposition 218. Distributes costs equitably among customer classifications. Avoids steep one-time increases and fluctuations. Provides Wastewater Enterprise Fund stability. Utilizes a comprehensive and transparent Excel-based rate model that will be provided to the City for future use, along with training to City staff. Prepare rate survey to compare Hayward's proposed rates to other nearby and similarly sized cities and sanitary districts. Assist City staff with presentation of the recommended Wastewater rates to the City Council at a work session and public hearing. Task 3 Deliverables: Comprehensive Technical Memorandum that documents cost allocations, recommended rate structure and basis for Wastewater rates, as well as Wastewater connection fee update Wastewater rate survey comparing the City proposed rates to those of other Wastewater purveyors Presentation materials including graphs, tables, and text to explain the process and recommended Wastewater rates to the Hayward City Council Excel-based rate model and training for City staff Task 4 - Develop A Ten-Year Financial Plan Prepare a ten-year financial plan and rate structure for Wastewater Fund that: Incorporates forecasted rates (from Task 3) and expenses. Considers projected changes in wastewater discharge. Maintains sufficient reserves to maintain adequate cash flow under periods of reduced demand. Provides required debt service coverage. Provides sufficient funding for system replacements and maintenance. Utilizes a comprehensive and transparent Excel-based model that will be provided to the City for future use, along with training to City staff. Task 4 Deliverables Excel-based ten-year financial plan and training for staff Task 5 - Draft and Final Reports Prepare draft report that documents the Wastewater rate study results, including a description of the methodology, findings, cost allocations, recommended Wastewater rates and the nexus between services provided and benefits from those services. Incorporate City comments and prepare final report. Task 5 Deliverables Draft and Final Reports Task 6 - Optional Services Consultants are invited to recommend additional optional services that could add value to the scope of work. The City may also request additional services during the term of the Agreement, such as preparation of recommended wastewater rates and updates of financial plans. Costs for such additional services shall be determined as requested, and no optional or additional work will commence without written approval from the City.
Conceptual
Water / Sewer
$500,000,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
Multiple Locations, Hayward, CA
Related To This Project
Hayward, CA
Bid Date: Apr 27 2021
Hayward, CA
--
Hayward, CA
Bid Date: Jul 25 2024
Hayward, CA
Bid Date: Aug 13 2024
Hayward, CA
Bid Date: Jul 30 2024
Hayward, CA
Bid Date: Jul 25 2024
Hayward, CA
Bid Date: Oct 30 2024
Hayward, CA
Bid Date: Jun 11 2024
Hayward, CA
Bid Date: Jun 20 2024
Hayward, CA
Bid Date: Jun 06 2024
Hayward, CA
Bid Date: May 30 2024
Hayward, CA
Bid Date: May 23 2024
Hayward, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.