BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Alexandria, Louisiana. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Question Deadline 06/11/2024 Last Request for Substitution Due: 7 days prior to due date of bids. A. Summary Project Description: Renovations and additions to a high school. B. Contract Scope: Construction, demolition, and renovation. C. Contract Terms: Lump sum (fixed price, stipulated sum). D. Estimated Contract Amount: $14,000,000.00. The Scope of Work includes one (1) Project consisting of four (4) sub-projects as follows Classroom Addition: Two-story, steel-framed, spray-on fireproofing, drilled concrete shaft foundation. Tornado shelter at first floor portion of addition, with reinforced CMU wall construction, along with two single-use restrooms, classrooms. Classrooms, seminar rooms, egress stair, two single-use restrooms at second floor portion. Sprinkler system protects second floor and first floor portions of the addition. Two-hour fire-rated separation wall between new addition and existing school. New Fieldhouse: Single-story, steel framed, drilled concrete shaft foundation. CMU and metal panel siding wall construction. Meeting Room, locker rooms, restrooms, showers, storage, offices. Central hallway with clearstory windows. Covered porch. Renovated Fieldhouse: Certain amount of interior demolition of walls, HVAC system, plumbing and lighting. CMU interior wall construction. One-hour fire-rated roof-ceiling separation. Roof replacement, TPO system. Replace HVAC system, lighting, plumbing; add plumbing fixtures. School Renovations: New location for Health Center. Add two Classrooms; renovate Library. Replace all exterior storefront entrance doors; coordinate access control at specific locations. Remodel and expand all existing restrooms, replace all plumbing fixtures and increase count. The Owner Reserves The Right To Reject Any Or All Bids For Just Cause. Such Actions Will Be In Accordance With Title 38 Of The L.r.s. In Accordance With R.s. 38:2212(B)(1), The Provisions And Requirements Stated In The Bidding Documents Shall Not Be Considered As Informalities And Shall Not Be Waived. Each Bidder Must Deposit With The Bid, Security In The Amount Of At Least Five Percent (5%) Of The Total Bid Price, As Described In The Instructions To Bidders. Bid Bonds Shall Be Written By A Surety Or Insurance Company Meeting The Requirements Noted In L.r.s. 38:2218. The Successful Bidder Shall Be Required To Furnish A Performance Bond And Payment Bond, In An Amount Equal To 100% Of The Contract Amount, Written By A Surety Or Insurance Company Meeting The Requirements Noted In L.r.s. 38:2219 A. (1)(A), (B) And (C). Any Person With Disabilities Requiring Special Accommodations Must Contact The Owner No Later Than Seven (7) Days Prior To Bid Opening. lassroom Addition: Two-story, Steel-framed, Spray-on Fireproofing, Drilled Concrete Shaft Foundation. Tornado Shelter At First Floor Portion Of Addition, With Reinforced Cmu Wall Construction, Along With Two Single-use Restrooms, Classrooms. Classrooms, Seminar Rooms, Egress Stair, Two Single-use Restrooms At Second Floor Portion. Sprinkler System Protects Second Floor And First Floor Portions Of The Addition. Two-hour Fire-rated Separation Wall Between New Addition And Existing School. New Fieldhouse: Single-story, Steel Framed, Drilled Concrete Shaft Foundation. Cmu And Metal Panel Siding Wall Construction. Meeting Room, Locker Rooms, Restrooms, Showers, Storage, Offices. Central Hallway With Clearstory Windows. Covered Porch. Renovated Fieldhouse: Certain Amount Of Interior Demolition Of Walls, Hvac System, Plumbing And Lighting. Cmu Interior Wall Construction. One-hour Fire-rated Roof-ceiling Separation. Roof Replacement, Tpo System. Replace Hvac System, Lighting, Plumbing; Add Plumbing Fixtures. School Renovations: New Location For Health Center. Add Two Classrooms; Renovate Library. Replace All Exterior Storefront Entrance Doors; Coordinate Access Control At Specific Locations. Remodel And Expand All Existing Restrooms, Replace All Plumbing Fixtures And Increase Count. Anticipated Award Date: July 2, 2024

Award

Educational

$11,838,000.00

Public - County

Addition, Demolition, Renovation, Site Work

195

32

90

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
210
All Active Projects
70
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

September 2, 2024

img_map_placeholder

800 Ola St, Alexandria, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.