BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2024 at 8:00 PM

Updated May 30, 2024

This is a service / maintenance or supply contract in Miami, Florida. Contact the soliciting agency for additional information.

If you have any questions, contact Elva Reyes at 305-375-2930. Estimated Value: $3,395,250 Work under this contract includes, but is not limited to the following: Furnishing all supervision, labor, required materials, equipment, tools and performing all operations necessary to completely remove and dispose of debris, vegetation, soil, rock, and any type of blockage inside existing pipe culvert(s), box culvert(s) or inlet structure(s) located with County maintained rights-of-ways pursuant to Mayor's, Governor's, or President Declaration of Emergency (Declaration of Emergency). The Work may also include nighttime work as directed by the County. The County, at its discretion, may award more than one contract based on the proposals received and the impacts of events associated with the Declaration of Emergency. If more than one award is made, award will be based off lowest responsive bid then the next lowest responsive bid and so forth and activated in the same order based on the Contractors availability and ability to satisfy the needs of the County at the time contacted. Illustrative Work Tasks may involve the following: 1. Access to the pipe or box culvert may require temporary removal of fence, signs, guardrail, grates or manhole covers. 2. Clean existing pipe or box culverts by completely removing all of the debris, vegetation, soil, rock, and any type of blockage to restore the hydraulic conveyance design capacity of the pipe or box culvert. 3. Clean existing inlet structures by completely removing all of the debris, vegetation, soil, rock, and any type of blockage. 4. Perform clearing operations in a manner not to damage the pipe culverts, box culverts, and inlet structures or surrounding area. 5. Meet the requirements of Federal, State and local environmental standards and laws when performing all activities. 6. Identify and report to Engineer necessary repairs to the pipes or box culverts and structures exposed during the clearing operation. 7. Document by GPS location of items cleaned and/or desilted and take pictures before and after performing the work using GPS coordinates embedded on the picture. B. If any changes are required due to conflict of design and or field conditions, the Engineer will make the final determination. SBE-Con. Requirements: NO Percentage: 0.00% SBD Certificate of Assurance Form Required: NO DBE Participation: YES Percentage: 10.67% DBE Subcontractor Forms Required: NO CWP Requirements: NO Percentage: 0.00% SBE-S Requirements NO Percentage: 0.00% SBE-G Requirements NO Percentage: 0.00% Liquidated Damages: YES $$ Per Day: $2,650.00

Post-Bid

Water / Sewer

$3,395,250.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
124
Bidding Soon
1,670
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 29, 2024

Project location map

Multiple Locations, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.