BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Mississauga, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The purpose of this Request for Pre-qualification (RFPQ) is to pre-qualify General Contractors with experience in major road reconstruction. Background and Brief Scope of Work Bloor Street is a four-lane major collector road with two lanes on each direction and varying roadway cross-sections. Within the project area, Bloor Street connects to Central Parkway East on the west limit and the City of Toronto on the east limit, for an approximate project length of 4.6 km. The City has assessed the infrastructure needs along this corridor as part of the City's Integrated Road Program to streamline the design and construction of the City's infrastructure projects and improve collaboration during project delivery through project bundling. This has provided an opportunity to identify and implement various safety improvements to help make Bloor Street safer and more accessible to pedestrians, cyclists and transit users as guided by the City's Vision Zero Action Plan including: - transitioning 4-lane roads to 2 plus 1 centre turn lane configuration; - providing narrower lane widths to improve speed compliance and reduce crossing distances, providing protected and dedicated cycling infrastructure; and - providing protected crossings to improve pedestrian safety and accessibility to transit. The work within the Bloor Street Integrated Road project includes, but is not limited to: - pavement reconstruction work (full-depth), installation of in-boulevard cycle tracks, transit improvements (such as construction of concrete bus lay-bys, shelter pads and platforms); - installation of splash pads, curb realignment (including removal and replacement and subdrain installation); - sidewalk and driveway apron replacement and repairs on both sides of the road; - installation of a new section of storm sewer to serve the Silverthorn Pumping Station property that will connect to existing storm sewer network (approximately 100m, which pipe diameters and details will be available in the RFT stage); - construction of low impact development features (infiltration chambers), oil/grit separators (OGS) at the Little Etobicoke Creek; - tree removal and installation, root pruning, topsoil and sodding, - catch basin removals, adjustments, relocations and repairs, maintenance hole adjustments and repairs, water valve and handwell adjustments, hydrant relocations; - electrical works (removal and installation of street light poles, conduits and fixtures, traffic signals modifications, new installation and replacement); - a new mid-block signalized pedestrian crossing at Applewood Trail; - relocation and/or adjustment of below and/or above ground utilities; - excavation and off-site disposal in accordance with the Environmental Protection Act and associated regulation, restoration of disturbed areas, tree protection; - protection, maintenance and management and pavement markings. Documents may be obtained at https://mississauga.bidsandtenders.ca/ Question Deadline: Wed Jun 12, 2024 4:00:00 PM Bid values are undisclosed.

Bid Results

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
461
Active Projects
248
Bidding Soon
4,538
All Active Projects
1,775
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 18, 2024

October 1, 2024

November 30, 2025

img_map_placeholder

Bloor St, Mississauga, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.