BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Laguna Niguel, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the stated above project. The general items of work to be done hereunder consists of: clearing and grubbing: traffic control; removing and replacing variable thickness of asphalt concrete; crack sealing; furnish and place type II slurry seal adjusting utilities; installing striping and pavement markings; and adjusting utilities. All work shall be completed within 45 working days from the date of the Notice to Proceed with Construction Activities, anticipated to start in July 2024. Q&A Deadline 06/03/2024 5:00 PM (PDT) Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum License Requirements A - General Engineering Online Q&A Yes Q&A Deadline 06/03/2024 5:00 PM (PDT) Pre-Bid Meeting No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000/Calendar Day The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the stated above project. The general items of work to be done hereunder consists of: clearing and grubbing: traffic control; removing and replacing variable thickness of asphalt concrete; crack sealing; furnish and place REAS Type II; removing and installing striping and pavement markings; installing traffic loops; and adjusting manhole covers and water valves. All work shall be completed within 45 working days from the date of the Notice to Proceed with Construction Activities, anticipated to start in July 2024.

Bid Results

Roads / Highways

$1,245,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
113
Bidding Soon
2,435
All Active Projects
1,088
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 8, 2024

img_map_placeholder

Multiple Locations, Laguna Niguel, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.