Published June 13, 2024 at 8:00 PM

Updated June 14, 2024

Site work for a water / sewer project in Green Bay, Wisconsin. Completed plans call for site work for a water / sewer project.

The Work Under This Contract Includes Approximately 415 Linear Feet of 8" and 10" Sanitary Sewer Relay Including Sanitary Sewer Reconnections, Sanitary Spot Repairs, Sanitary Manhole Construction, Replacement, and Reconstruction, 8130 Linear Feet of 8", 10", 12" and 15" Cipp Lining, 180 Linear Feet of 12", 15", and 36" Storm Sewer Relay Including Storm Sewer Reconnections, Storm Spot Repair, Storm Manhole Replacement, Concrete and Asphalt Pavement Reconstruction, and Restoration. All Proposals Must Be Submitted Through online via Their Electronic V Bid Online Bid Service Provided for That Purpose and Issued to the Specific Bidder by the Director of Public Works Together a Bid Bond Equal to at Least Five (5)but Not More Than Ten (10)percent of the Bid Payable to the City of Green Bay as a Guarantee That if His/her Bid is Accepted, He/she Will Execute and File the Contract and a Performance Bond in the Amount of One Hundred Percent (100%) of the Total Bid Within Ten (10) Days After the Award of the Contract. Only the Proposal Pages, Surety Bond, Affidavit of Compliance ,disclosure of Ownership and Any Addenda Issued Shall Be Submitted. Only Proposals Submitted by Firms Appearing on the City of Green Bay List of Plan Holders Will Be Opened. In Case the Successful Bidder Shall Fail to Execute Such Contract and Performance Bond, the Amount of the Check or Bid Bond Shall Be Forfeited to the City as Liquidated Damages. ANY DESIGN QUESTIONS PERTAINING TO THIS PROJECT SHALL BE DIRECTED TO: DEPARTMENT OF PUBLIC WORKS 100 N. JEFFERSON STREET GREEN BAY, WI 54301 (920) 448-3100 Question Deadline 06/07/2024 All questions about the meanings or intent of the Contract Documents shall be submitted to the Engineer in writing. Replies will be issued by addendum posted to QuestCDN to all parties recorded as having received the Contract Documents. Only questions answered by formal written addendum shall be binding. Oral and other interpretations or clarifications shall be without legal effect In order to guarantee a response, questions shall be submitted no later than four (4) calendar days prior to t Add the following text to Section 107.12 of the City of Green Bay Standard Specifications: All work on Radisson Street, between N Quincy Street and N Webster Street, shall be completed by July 26 th , 2024. All work on St Robert Street, between He-Nis-Ra Lane and St Steven Court, shall be completed by July 26 th , 2024. All other work within this contract, besides the CIPP lining work, shall be completed by October 11 th , 2024. All CIPP Lining work within this contract shall be completed by December 13 th , 2024.

Award

Water / Sewer

$1,323,841.00

Public - City

Site Work

58

4

8

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

Project location map

Multiple Locations, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.