BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a communication facility in Buffalo, New York. Conceptual plans call for the renovation of a communication facility.

The Niagara Frontier Transportation Authority (NFTA) owner and operator of the NFTA-Metro, invites interested Consultants to submit a technical proposal that have the requisite, demonstrable competence, and experience in architectural, engineering, and other professional services for the design, construction monitoring, and design support services during construction for this project entitled "LRRT - Fiber Cable and Lighting Upgrade". Qualified firms both singly or in teams must have the requisite, demonstrated competence and experience in and a thorough knowledge of the required architectural and engineering services required for the project. The project work requires full architectural and engineering services including, but not limited to, survey, telecommunications, design of fiber optic cable and lighting infrastructure for rail, utility design and coordination (power, communications, internet), electrical (power distribution, communications including video surveillance), and fire protection. Qualified firms may be required to demonstrate experience and a plan to implement specialized software for real-time design, construction administration, and inspection of the project. Proposers must demonstrate their qualifications to execute projects that include the Scope of Work Elements outlined in Attachment B, Section II, and the Tasks outlined in Attachment B, Sections IV, V, and VI. This project shall Develop the designs for the installation of fiber optic cables and all the infrastructure elements needed to support the functioning of the tunnel lighting and the fiber optic cable network using the NFTA-LRRT alignment and terminate fiber in each station's Train Control - Communication (TCC) and/or Main Distribution Frame (MDF). The Consultant shall perform not less than 50% of the work with its own forces. The time of completion for the project is 217 calendar days after receipt of the Notice to Proceed. The established MBE, WBE and SDVOB goals are 10.0%, 0.0%, and 0.0% respectively. Location: Various Stations of the LRRT System The method of Contractor Selection has not been Determined at this time.

Conceptual

Communication

$500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
97
Bidding Soon
2,513
All Active Projects
1,064
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

img_map_placeholder

Multiple Locations, Buffalo, NY

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.