Site work and paving for a mixed-use development in Capac, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of July 30, 2024, the award amount is $4,397,270.80. Contract 1 - Water Distribution System Improvements The project includes the replacement of approximately 9,200 feet of watermain along with associated water services, curb and gutter, sidewalk, driveway approaches, HMA pavement, turf restoration, and all related work. Project also includes the replacement of approximately 50 mainline isolation valves throughout the Village. These installations are anticipated to include cut-in valves, insertion valves, and line-stops, along with surface restoration. The date the Bidding Documents are transmitted by the Issuing Office will be considered the Bidders date of receipt of the Bidding Documents. This project will be funded by a Drinking Water State Revolving Fund loan from the Michigan Department of Environmental, Great Lakes, and Energy (EGLE). Therefore, all contractors and subcontractors must comply with the EGLE Equivalency Projects Contract Boilerplate Language. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Village of Capac reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the Village of Capac. A pre-bid conference will not be held. Question Deadline 06/13/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. o This project is for replacement of approximately 9,200 feet of water main and appurtenances, water services, curb and gutter, sidewalk, driveway approaches, HMA pavement, concrete pavement, turf restoration, and all related work. Work includes replacement to within the dwelling of any lead or galvanized services in operation. o Project also includes replacement of inoperable mainline valves in various locations within the Village. Work associated with valve replacements includes utilization of line stops, insertion valves, and cut-in valves, concrete and HMA pavement restoration, turf restoration, and all related work. o Locations of known inoperable mainline valves are shown in Appendix C. It is anticipated that the location of other inoperable valves that will require replacement, or additional isolation valves that may be needed, will be discovered during the replacement of the mainline isolation valves in the known locations. Replacement or adding of these valves shall be as directed by the Engineer. o Isolation of the existing water system for connection of the new water main is anticipated to be challenging in areas until isolation valves are either replaced or added. The addition or replacement of valves adjacent to the water main replacement areas, as directed by the Engineer, should be anticipated. o Separate pay items have been established for the valve replacements and additions outside of the water main replacement areas. o The type of valve (cut-in or insertion), and the need for line stops, shall be evaluated with the Engineer at each location in the field prior to ordering materials.

Award

Water / Sewer

$4,397,271.00

Public - City

Paving, Site Work

40

14

4

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
81
Bidding Soon
1,351
All Active Projects
543
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Capac, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.