BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Work will consist of UCCE Site Utility Upgrades including water, sewer, and electrical points of connection to a modular building to be installed under a separate contract. The successful contractor shall be responsible for all necessary equipment, tools, materials, labor, and supplies required to perform the work as specified herein. Each bid must be accompanied by cash, a certified or cashier's check, or a bond in the sum of not less than 10% of the total aggregate of the bid price, including all additive bid items The Contractor must possess a Class A General Engineering Contractor's License issued by the Contractor's State License Board at the time the bid is submitted, per Business and Professions Code section 7028.15. Contract duration: 3 months Successful contractor shall be responsible for all necessary tools; materials; consumables, which shall include, but shall not be limited to, workers' supplies or protective garments and disposable items used in furtherance of completing the Work; waste management and disposal; prevailing wage labor; supplies; and non-specialty equipment required to perform the work as specified herein. See Exhibit C, Scope of Work/Specifications, for details. Contractor shall be required to provide the necessary trained personnel and supervision to perform UCCE Site Utility Upgrades. Responses to RFIs will be issued by Owner's Project Manager. RFI responses shall not change any requirement of the Contract Documents. Owner, whose decision is final, will clarify questions regarding the interpretation of the Contract Documents. If Contractor discovers conflicts, omissions, or errors in the Contract Documents, or has any questions concerning interpretation or needs clarification of Contract Documents, Contractor must immediately submit to the Project Manager, in writing, an RFI that clearly and concisely sets forth the issue for which interpretation or clarification is sought and Contractor's interpretation or understanding of the requirements, along with reasons why it has reached such an understanding. B. Responses to RFIs will be issued by Owner's Project Manager. RFI responses shall not change any requirement of the Contract Documents. Question Deadline 06/14/2024 that person must submit a written request for an interpretation or correction thereof to the Owners Authorized Representative at least 3 calendar days before the deadline for receipt of bids. 6.02. Any interpretation or correction of the Bid Documents will be made only by written addendum distributed solely via BidSync.com.

Bid Results

Water / Sewer

$255,281.00

Public - County

Site Work

11

10

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
138
Bidding Soon
2,635
All Active Projects
1,061
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 18, 2024

July 18, 2024

October 18, 2024

img_map_placeholder

5283 Snell Ave, San Jose, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.