Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Pikeville, Tennessee. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Bledsoe County Project No. 04003-3219-04 (PIN 128965.00) The grading, drainage, stream relocation, widening, and resurfacing on Summer City Road, S.R. 30, and S.R. 443. Project Length - 5.070 miles Completion Time - On or before 5/31/2025 (See Special Provision 108B) Please contact the Secretary of State should you have any questions at (615) 741-2286 or visit website. Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of Contractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. The Department encourages the use of disadvantaged business enterprises on all contracts TNDOT - 002 - Grading, Drainage, Stream Relocation, Widening, and Resurfacing on Summer City Road Description This work consists of the conditions that apply to all construction activities on the project pursuant to the following: 1. Section 404 of the Federal Clean Water Act (33 U.S.C. 1344), and all implementing regulations, including without limitation regulations of the U.S. Army Corps of Engineers governing permits for discharges of dredged or fill material into waters of the United States in 33 CFR Part 323; and 2. The Tennessee Water Quality Control Act (T.C.A. 69-3-101, et seq.) and all implementing regulations, including without limitation the Rules of the Tennessee Department of Environment and Conservation governing NPDES permits in Chapter 400- 40-10, and Aquatic Resource Alteration permits in Chapter 400-40-7; and 3. Section 26a of the TVA Act of 1933 as amended (49 Stat. 1079, 16 U. S. C. sec. 831y1.) and all implementing regulations, including without limitation the regulations of the Tennessee Valley Authority governing construction in the Tennessee River System in 18 C.F.R., Part 1304; and 4. The Tennessee Wildlife Resources Agency Reelfoot Lake Watershed Management permit program (T.C.A. section 70-5-1,), and all implementing regulations, including without limitation regulations authorizing any activity, practice, or project which has or is likely to have the effect of diverting surface or subsurface water from the Lake or have the effect of draining or otherwise removing water from Reelfoot Lake; and 5. Coast Guard Bridge Permit (USCG) (Section 9 of the Rivers and Harbors Appropriation Act of 1899) and all implementing regulations, including but not without limitation for projects which impact streams deemed navigable by the U.S. Coast Guard SCOPE OF WORK: The scope of work to be performed is the removal and disposal of asbestos-containing materials as defined and quantified in the Drawings. The work of the contract shall be performed in compliance with the specifications.
Award
Roads / Highways
$4,999,709.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2024
August 21, 2024
Summer City Rd, Pikeville, TN
Related To This Project
Pikeville, TN
Bid Date: Jun 26 2024
Pikeville, TN
Bid Date: Jun 26 2024
Pikeville, TN
Bid Date: Aug 07 2024
Pikeville, TN
Bid Date: Jul 08 2024
Pikeville, TN
Bid Date: Jul 19 2024
Pikeville, TN
Bid Date: Jul 19 2024
Pikeville, TN
Bid Date: Aug 09 2024
Pikeville, TN
Bid Date: Nov 01 2024
Pikeville, TN
Bid Date: Jun 03 2024
Pikeville, TN
Bid Date: May 03 2024
Pikeville, TN
Bid Date: Apr 19 2024
Pikeville, TN
Bid Date: May 10 2024
Pikeville, TN
Bid Date: May 10 2024
Pikeville, TN
Bid Date: Apr 17 2024
Pikeville, TN
Bid Date: Mar 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.