BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Temecula, California. Completed plans call for site work for a water / sewer project.

The work comprises construction of PVC gravity sewer pipeline, manholes and appurtenances in accordance with Contract Drawings and Specifications, performing shoring and bracing per California Labor Code, performing trench backfill, pavement removal and replacement per encroachment permit issued by the County of Riverside and City of Temecula, perform approximate 150 linear leaner feet jack/bore installation, performing sewer flow bypass at required existing manhole locations, performing earthwork to construct maintenance and access road, preparation of SWPPP and implementation of BMPs during construction, developing and performing traffic control during construction, obtaining permits from the Riverside County Department of Environmental Health for destruction of groundwater monitoring wells per permit requirements, as well as all other miscellaneous items in accordance with contract drawings and specifications. Schedule A- Northern Wine Country - Phase II Sewer: The work comprises construction of approximately 4,100 linear feet of 12-inch and 9,700 linear feet of 8-inch sanitary sewer main, and installation of 4-inch and 6-inch service laterals to property lines and 8-inch stub-outs along the construction location. Schedule B- Southern Wine Country Sewer: The work comprises construction of approximately 13,600 linear feet of 15-inch sanitary sewer main and 6,000 linear feet of 12-inch sanitary sewer main, 3,200 linear feet of 10- inch sewer main as well as 4-inch and 6-inch service laterals to property lines and 8-inch stub outs along the construction location. Project Type Bid Response Types Line Items Proposal Package (required) Bid Bond (required) Type of Award Lump Sum License Requirements Classification A - General Engineering Contractor and/or Classification C-34 - Pipeline Contractor Restriction online Restricted To Must meet one of the following restrictions: CADIR - Registered DIR Public Works Contractor Liquidated Damages $1000 Estimated Bid Value $23.5 - $26.5 Million Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 06/03/2024 5:00 PM (PDT)Online Q&A Yes All questions must be submitted through PlanetBids Please Note: Questions will be answered via Addendum only. Questions received after the deadline will be accepted. However, we do not guarantee that there will be a response to the question. Responses will be on a case-by-case basis *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work comprises construction of PVC gravity sewer pipeline, manholes and appurtenances in accordance with Contract Drawings and Specifications, performing shoring and bracing per California Labor Code, performing trench backfill, pavement removal and replacement per encroachment permit issued by the County of Riverside and City of Temecula, perform approximate 150 linear leaner feet jack and bore installation, performing sewer flow bypass at required existing manhole locations, performing earthwork to construct maintenance and access road, preparation of SWPPP and implementation of BMPs during construction, performing traffic control during construction, obtaining permits from the Riverside County Department of Environmental Health for destruction of groundwater monitoring wells per permit requirements, as well as all other miscellaneous items in accordance with contract drawings and specifications.

Award

Water / Sewer

$22,571,280.00

Public - County

Site Work

66

18

69

8

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
91
Bidding Soon
1,892
All Active Projects
868
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

September 9, 2024

img_map_placeholder

33205 Temecula Pkwy, Temecula, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.