Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 28, 2025 at 7:00 PM
Updated April 17, 2025
Site work, renovation and addition to a medical facility in Richmond, British Columbia. Working plans call for the renovation of a medical facility; for site work for a medical facility; and for the addition of a 523,800-square-foot medical facility.
Construction of a new state of the art acute care tower (approximately 48,500 square metres), the Yurkovich Family Pavilion, which includes emergency department, medical imaging, perioperative pre- and post- surgical care spaces, ambulatory procedure rooms, 16 bed critical care unit, 192 single occupancy inpatient rooms, and support services, such as pharmacy and medical device reprocessing. Richmond Hospital is currently undergoing a multi-phase redevelopment of the Richmond Hospital campus. The expansion and renovation of Richmond Hospital is being conducted to allow for continuity of hospital services throughout construction and will add 113 new beds, increasing the hospital's in-patient capacity to a total of 353 beds. The Project comprises Phases 2 and 3 of the expansion and renovation and is expected to include: Phase 2 – Yurkovich Family Pavilion Design and Construction Design and construction of a new acute care tower on the southeast corner of the existing Richmond Hospital campus which includes: Inpatient units with 192 single occupancy rooms; 12 with negative air pressure capability; Critical care unit with 16 single occupancy rooms; 6 with negative air pressure capability; Perioperative department with: 11 new operating rooms; 1 with negative air pressure capability and 1 hybrid operating room, 69 pre- and post-op care spaces, and 8 new co-located procedure rooms; 1 with negative air pressure capability; Medical device reprocessing department, medical imaging department, emergency department, pharmacy department and biomedical engineering department; New and upgraded equipment; Mechanical and electrical services; Connections to adjacent facilities; Below grade parking for vehicles and bicycles; Garbage/recycling exterior facilities; Related site works and road works to connect the Yurkovich Family Pavilion with city streets and services; Improvements to vehicular circulation on campus. Phase 3 – South Tower and Ilich Pavilion Renovations Renovate decanted areas in South Tower Level 1 and 2 to accommodate inpatient psychiatry, psychiatry assessment unit, medical/surgical inpatient units, and the main loading and logistics area; Renovate Ilich Pavilion Level 1 and 2 to accommodate clinical support functions. The Project consists of Phase 2, the Yurkovich Family Pavilion (YFP) Design and Construction, and Phase 3, South Tower and Ilich Pavilion Renovations. TIMELINE: Design/Build Request for Qualifications for interested parties to submit Responses indicating their interest in, and qualifications for, the Richmond Hospital Redevelopment Project: Phases 2 and 3 (the "Project") has closed and the preferred team has been chosen. Phase two construction of the new Yurkovich Family Pavilion is expected to start in 2026 and be completed by 2029. Further update in summer 2025. *The approved budget for the Richmond Hospital Redevelopment Project (inclusive of phases 1-4) is approximately $1.95 billion.
Pre-Construction/Negotiated
Medical
$1,950,000,000.00
Public - State/Provincial
Addition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2024
September 30, 2026
7000 Westminster Hwy, Richmond, BC
Related To This Project
Richmond, BC
Bid Date: Jul 03 2024
Richmond, BC
Bid Date: Jun 26 2024
Richmond, BC
Bid Date: Jul 09 2024
Richmond, BC
--
Richmond, BC
Bid Date: Jul 16 2024
Richmond, BC
Bid Date: Jul 26 2024
Richmond, BC
Bid Date: Jul 23 2024
Richmond, BC
Bid Date: Jul 02 2021
Richmond, BC
Bid Date: Jul 02 2024
Richmond, BC
Bid Date: Jul 04 2024
Richmond, BC
Bid Date: Jun 28 2024
Richmond, BC
Bid Date: Jun 17 2024
Richmond, BC
Bid Date: Jun 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
