BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated April 17, 2025

Site work, renovation and addition to a medical facility in Richmond, British Columbia. Working plans call for the renovation of a medical facility; for site work for a medical facility; and for the addition of a 523,800-square-foot medical facility.

Construction of a new state of the art acute care tower (approximately 48,500 square metres), the Yurkovich Family Pavilion, which includes emergency department, medical imaging, perioperative pre- and post- surgical care spaces, ambulatory procedure rooms, 16 bed critical care unit, 192 single occupancy inpatient rooms, and support services, such as pharmacy and medical device reprocessing. Richmond Hospital is currently undergoing a multi-phase redevelopment of the Richmond Hospital campus. The expansion and renovation of Richmond Hospital is being conducted to allow for continuity of hospital services throughout construction and will add 113 new beds, increasing the hospital's in-patient capacity to a total of 353 beds. The Project comprises Phases 2 and 3 of the expansion and renovation and is expected to include: Phase 2 – Yurkovich Family Pavilion Design and Construction Design and construction of a new acute care tower on the southeast corner of the existing Richmond Hospital campus which includes: Inpatient units with 192 single occupancy rooms; 12 with negative air pressure capability; Critical care unit with 16 single occupancy rooms; 6 with negative air pressure capability; Perioperative department with: 11 new operating rooms; 1 with negative air pressure capability and 1 hybrid operating room, 69 pre- and post-op care spaces, and 8 new co-located procedure rooms; 1 with negative air pressure capability; Medical device reprocessing department, medical imaging department, emergency department, pharmacy department and biomedical engineering department; New and upgraded equipment; Mechanical and electrical services; Connections to adjacent facilities; Below grade parking for vehicles and bicycles; Garbage/recycling exterior facilities; Related site works and road works to connect the Yurkovich Family Pavilion with city streets and services; Improvements to vehicular circulation on campus. Phase 3 – South Tower and Ilich Pavilion Renovations Renovate decanted areas in South Tower Level 1 and 2 to accommodate inpatient psychiatry, psychiatry assessment unit, medical/surgical inpatient units, and the main loading and logistics area; Renovate Ilich Pavilion Level 1 and 2 to accommodate clinical support functions. The Project consists of Phase 2, the Yurkovich Family Pavilion (YFP) Design and Construction, and Phase 3, South Tower and Ilich Pavilion Renovations. TIMELINE: Design/Build Request for Qualifications for interested parties to submit Responses indicating their interest in, and qualifications for, the Richmond Hospital Redevelopment Project: Phases 2 and 3 (the "Project") has closed and the preferred team has been chosen. Phase two construction of the new Yurkovich Family Pavilion is expected to start in 2026 and be completed by 2029. Further update in summer 2025. *The approved budget for the Richmond Hospital Redevelopment Project (inclusive of phases 1-4) is approximately $1.95 billion.

Pre-Construction/Negotiated

Medical

$1,950,000,000.00

Public - State/Provincial

Addition, Renovation, Site Work

4

7

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
95
Bidding Soon
2,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 30, 2026

Project location map

7000 Westminster Hwy, Richmond, BC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.