BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Renovation of a multi-residential development in Fort Myers, Florida. Completed plans call for the renovation of a multi-residential development.

Gateway Gardens Project Bid Packages: BP#02A Selective Demolition BP#03A Concrete BP#22A Plumbing BP#26A Electrical & Systems BP#31A Earthwork, Drainage, Utilities, Paving, Curbs & Walks BP#32A Landscape & Sod Only firms meeting prequalification criteria may bid. Interested firms may complete the prequalification form by visiting Chris-Tel Construction's website under the "Subcontractors" tab. Please call our office for additional assistance (239-226-0500). Firms must submit a completed experience questionnaire and financial statement on the form entitled "Chris-Tel Construction's Bidder Qualifications", incorporated herein by reference before prequalification can be determined. The firm's financial condition must demonstrate that adequate fixed and liquid assets and equipment are available to properly perform the Subcontract. The firm must have successfully completed no less than two (2) projects of similar size and complexity within the last five (5) years. Firms must be licensed by the State of Florida for the work they are to perform. Firms must also be acceptable to The City of Fort Myers Redevelopment Agency and Chris-Tel Construction. All firms awarded subcontracts agree to comply with all provisions of Chapter 8 United States Code Section 1324a by not employing nor continuing employment of an unauthorized alien as defined by law. All firms awarded subcontracts agree to use the E-Verify system for any employees they may hire during the term of this project and shall be required to provide Chris-Tel Construction with an affidavit stating the subcontractor does not employ, contract with, or subcontract with an unauthorized alien, as stated in Section 448.095, Florida Statutes. All firms awarded subcontracts agree to abide by Executive Order No. 11246 of September 24, 1965, and all awardees will, in all solicitations or advancements for employees placed by or behalf of the awardee, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. MINORITY BUSINESS ENTERPRISE PARTICIPATION POLICY: The City of Fort Myers has adopted an Ordinance establishing an overall 15% goal for local Minority Business Enterprise (MBE) participation in City procurements. CM will take all reasonable and necessary affirmative steps to assure that local DBE firms will be utilized for this project. This specific project will attempt to meet a 15% goal for Local DBE participation. This Project will be bid on a Stipulated Sum basis. Partial or incomplete bids are subject to rejection. Bids must be submitted on an exact reproduction of the bid form supplied. The Owner and Chris-Tel Construction reserve the right to waive any and all irregularities and informalities and to reject any or all bids for any reason.

Award

Multi-Residential

$2,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
69
Bidding Soon
965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

Project location map

Fowler St & Dr Martin Luther King Jr Blvd, Fort Myers, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.