Site work and paving for a mixed-use development in Pewaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
2024 Pewaukee Road and Utility Improvements. Approximate quantities of major items are as follows: Inlet protection 45 EA Sawcut 1,328 LF Remove curb and gutter 978 LF Remove sidewalk 3,913 SF Full-depth mill asphalt pavement 16,333 SY Concrete curb and gutter 1,968 LF Concrete sidewalk 4,456 SF Concrete pavement (6- inch) 6,780 SF Concrete driveway approach 1,064 SF Detectable warning field 240 SF HMA pavement 4,671 TON Base aggregate dense 2,272 TON Water main 1,714 LF Fire hydrant assembly 5 EA Copper service laterals 423 LF Connections to existing service 19 EA Gate valve 7 EA Storm sewer pipe 100 LF Storm manhole/catch basin 5 EA Traffic control/dust control 1 LS Pavement markings 8,307 LF Restoration (topsoil, hydro-seed) 1 LS Excavation below subgrade 1,594 CY MSE retaining wall 350 SF (face) This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. Project is to be substantially complete on, or before, October 6, 2024. The Contract letting shall be subject to the provisions of Sections 62.15, 66.0901. of the Wisconsin Statutes. All bidders must file a Bidders Qualification Statement with the Owner on or before 4:00 PM on Friday, July 5, 2024, unless already submitted to the Village of Pewaukee for 2024. Bids shall be submitted on the electronic Bid Form provided through online. All required blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. Failure to list subcontractors or suppliers may be cause for rejection of the Bid. Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of 5 percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids which best serve the interests of the Owner, subject to the provisions of Wisconsin Statutes, Sections 62.15 and 66.0901. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price. Prime Contractor(s) shall furnish listing of all subcontractors and suppliers performing labor and supplying materials under the Contract that individually have a total value of $1,000 or more at the time of the bid. Plans and specifications for this project were prepared by consulting engineers, raSmith - 16745 West Bluemound Road, Brookfield, Wisconsin, 53005. Est. Value: $ 1,025,000.00 Security shall be forfeited to Owner as liquidated damages. \ Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids which best serve the interests of the Owner,
Award
Sidewalks / Parking Lot
$1,027,418.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2024
September 9, 2024
Multiple Locations, Pewaukee, WI
Related To This Project
Pewaukee, WI
Bid Date: Jul 03 2024
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
Bid Date: Aug 12 2024
Pewaukee, WI
Bid Date: Jun 06 2024
Pewaukee, WI
Bid Date: May 16 2024
Pewaukee, WI
--
Pewaukee, WI
Bid Date: May 14 2024
Pewaukee, WI
--
Pewaukee, WI
--
Pewaukee, WI
Bid Date: Mar 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.