Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 12, 2024 at 8:00 PM
Updated July 13, 2024
Site work and paving for a mixed-use development in Carrot River, Saskatchewan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Water capital project in the Town of Carrot River to be completed in June 2024. Replace 150m of 150mm ductile iron water line with 150mm HDPE water line via directional drilling. - Replace one 150mm Mueller Valve and one 150mm tee - Five Service Connections - Install connection from existing 8" C900 water line to new 150mm HDPE water line. - Install connection from existing 150mm C900 water line to new 150mm HDPE water line. All serviced residents affected must be provided with temporary services while work is being done. Asphalt and concrete to be hauled away, street returned to curb level with .5m of gravel surface, all lines require proper sand bedding. Complete maps are available of contract area. All work must be completed by June 15, 2024.
Post-Bid
Water / Sewer
$120,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Plans. If Specifications become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2024
June 10, 2024
Multiple Locations, Carrot River, SK
Related To This Project
Carrot River, SK
Bid Date: Jul 12 2024
Carrot River, SK
Bid Date: Nov 13 2024
Carrot River, SK
Bid Date: Aug 21 2025
Carrot River, SK
Bid Date: Jan 13 2021
Carrot River, SK
Bid Date: Jun 14 2024
Carrot River, SK
Bid Date: Apr 29 2024
Carrot River, SK
Bid Date: Apr 30 2024
Carrot River, SK
Bid Date: Jan 18 2024
Carrot River, SK
Bid Date: Apr 27 2022
Carrot River, SK
--
Carrot River, SK
Bid Date: Jul 04 2023
Carrot River, SK
Bid Date: May 26 2023
Carrot River, SK
Bid Date: Apr 28 2023
Carrot River, SK
Bid Date: Mar 04 2024
Carrot River, SK
Bid Date: Aug 23 2022
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
