BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Long Beach, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://www.heavyliftpfi.com/sectors/long-beach-sets-out-capital-expenditure-plans/31645.article USD368.3 million (a year-on-year increase of 47.2 percent) been earmarked for capital improvements. This will help to advance the Pier B on-dock rail support facility that aims to increase the number of containers moved at the port using trains. Funding has also been allocated to the proposed Pier Wind development, which if approved would become the largest offshore wind turbine assembly facility in the USA. The budget also includes allocations for safety, cleanliness and water quality of Long Beach’s 7 mile (11.3 km) coastline. USD25 million in subsidies from the Clean Truck Fund will support the transition of the heavy-duty truck fleet to zero emissions. The port of Long Beach itself intends to possess a zero-emissions cargo-handling fleet by 2030, and achieve zero-emissions trucking at the gateway by 2035. Over the next 10 years, the port plans to invest some USD2.3 billion in capital improvements to boost capacity, competitiveness and sustainability. ----------------------------------------------------------------------- The City of Long Beach is seeking proposals from professional Civil/Traffic Engineering design firms with extensive survey services capabilities to design construction plans, specifications, and estimate (PS&E) to build multiple configurations of bulb-outs and pedestrian refuge islands in Downtown Long Beach. The project is federally funded under the federal Active Transportation Program. This request for proposals (RFP) is intended to secure a contract with a professional Civil/Traffic Engineering design firm with extensive survey capabilities to design a series of curb extensions/bulb outs and pedestrian refuge islands across 53 intersections in the downtown Long Beach area. The design effort will include the creation of a completed bid package of signed Mylar plans, specifications, and construction estimate (PS&E) based off plan takeoffs in addition to the submission of the Caltrans construction RFA package. The design must provide for a total of 190 configurations, of which 171 are curb extensions/bulb-outs and 19 pedestrian refugee islands in various forms. The pedestrian refugee islands must be designed as permanent installations as part of the downtown cycle track running east to west along Third Street and Broadway. The final design, as indicated on the 30% concept plans in the appendices, incorporates a combination of native landscaping and bioswales as well as changes that could be made throughout the design process. The final signed plan set shall conform to the most recent October Caltrans 2023 standards for plans and specifications. Upon final completion and submittal of the PS&E package, the selected designer will also be required to complete all required Caltrans request for authorization (RFA) forms to proceed with construction leading to the E-76 document. Caltrans refers to these documents as the construction RFA package. This contract will be for a period of two years with the option to renew for three additional one-year periods. The total contract term will not exceed five years. Anthony Delgado rfppurchasing@longbeach.gov All communication with the City related to this RFP must be directed to the contact listed above. The goal of this project is to develop a set of signed and approved construction plans over a 12-month period that can be bid out for construction purposes in 2026. (They will also deliver designs for 19 permanent pedestrian refuge islands completing the downtown cycle track on Third Street and Broadway in the heart of downtown Long Beach. Since this project utilizes federal funds, the selected designer will need to meet the Disadvantage Business Enterprise (DBE) goal of (7%) or provide sufficient Good Faith Effort documentation.) Add Set asides((DBE) goal of (7%) Q&A to June 5, 2024 Submit all inquiries via email to rfppurchasing@longbeach.gov) It is mandatory that you attend the pre-proposal meeting. No bid will be accepted from a bidder that fails to attend the pre-proposal meeting. All bidders that do not attend the meeting will have their bids disqualified. The method of Contractor Selection has not been Determined at this time Change the date for the Posting of the Q&A to June 20, 2024

Conceptual

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

21

3

60

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,417
All Active Projects
949
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

img_map_placeholder

Multiple Locations, Long Beach, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.