BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Henderson ES - ACM Flooring & LBP Mitigation_Library, Staff TR & Corridors SCOPE OF WORK A. The work includes all labor, equipment, materials, and supplies necessary to perform the Scope of Work in the bid documents (refer to Contract Drawings in Appendix C, and Environmental Scope Sheets in Section 02 83 19 for additional details) by the procedures described herein. The contractor, by submitting a bid for the work, represents itself as knowledgeable and expert in the performance of the work, and includes all things usually and customarily necessary to provide a complete and finished job, whether specifically mentioned or not. B. Clean-up of lead-bearing dust, flakes, and residues; abatement of paint, architectural components, substrates, or other lead-bearing items listed in the Bid documents including precleaning, moving of furnishings, establishing regulated areas, isolating the Work Areas, protection of adjacent surfaces, containment when required, cleanup and decontamination to the specified clearance levels, proper packaging and disposal of wastes, and all other steps necessary to complete the scope of work. C. Repair or replacement of damaged surfaces, fixtures, or furnishings to restore them to their preexisting condition to the satisfaction of the Board Representative, MEC and school engineer. D. When the Bid documents include lead and asbestos abatement items in the same spaces, they should be performed in the sequence and combinations that produce the most efficient results and the least amount of total waste. That sequence will generally be: 1. Cleanup and removal of failed or delaminated friable asbestos-containing debris, if any. 2. Cleanup of lead dust, flakes, chips, and residues. If these lead wastes are mixed with asbestos debris, they must be disposed together as regulated lead waste or asbestos waste depending on TCLP results. 3. Removal of friable asbestos materials and cleanup of visible residues. 4. Removal of architectural components with lead-based paint still adhered, such as wood trim, doors, plaster, drywall, window frames, etc. 5. Removal of non-friable asbestos materials from the exterior. If both asbestos and lead are on the same components, for example lead paint and asbestos-containing glazing compound, the components may be removed and disposed as construction debris as long as both the lead- and asbestos-bearing materials remain intact. 6. Removal of lead-based paint, coatings, or surfacing material. 7. Final cleanup and decontamination of the work space. Final air clearance (asbestos) and wipe samples (lead) may be performed concurrently. 8. When lead and asbestos work is combined, the more stringent regulations and procedures shall apply for both.

Bid Results

Educational

$32,400.00

Public - City

Renovation

6

12

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
129
Bidding Soon
1,863
All Active Projects
838
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 8, 2024

img_map_placeholder

5650 S Wolcott Ave, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.