BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 1, 2024 at 8:00 PM

Updated June 12, 2024

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a 4,813-square-foot educational facility.

Herzl ES - Sand and Resurface Athletic Gym Floor Sand and Resurface Athletic Gym Floor - 4,813 sq. ft. Provide labor and material to complete the following: Sand and Resurface Athletic Gym Floor - 4,813 sq. ft. Re-sand to bare floor and repair/fill damaged boards. Apply two (2) coats of oil-based seal, re-paint game lines to specifications. Apply two (2) coats of oil-based finish. Game Lines: (1) Basketball (1) Volleyball Only Prequalified Pool Various Trades School: Theodore Herzl Elementary School, School Address: 3711 W Douglas Street, Chicago, IL 60623 The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If the bid price is over $25,000 or more, the bidder must be signatory to the relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Questions Due Date: May 28th 2024, 2:30 PM CDT

Post-Bid

Educational

$70,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
260
Bidding Soon
3,391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

Project location map

3711 W Douglas Blvd, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.