BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to an educational facility in Sacramento, California. Completed plans call for the addition of a 40,000-square-foot educational facility; for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The scope of this project includes, but is not limited to, the following: demolition, site work, new construction, renovation and addition to an educational facility. A firm construction timeline for this project has not yet been released. The estimated total project Target Cost construction value is: $193,000,000.00. UC Davis Health, located in Sacramento, has a 50-year history of providing high-quality patient care across the greater Sacramento region and the 33 counties it serves. UC Davis Health's 142-acre campus is served by central heating and cooling plant ("Central Plant") built in 1998 and is nearly at its utility capacity and requires an upgrade. Starting in 2019, UC Davis Health undertook a comprehensive utilities master planning effort to outline the infrastructure and facilities needed to address future healthcare, education, research, and teaching needs on the Sacramento campus and in the greater Sacramento region. The Utility Master Planning Team identified a critical need for UC Davis Health to upgrade utility services and expand the infrastructure to support current and upcoming utility operations. The Central Utility Plan (CUP) Expansion addresses the utility requirements for the new buildings at UC Davis Health's Sacramento campus. The upgrade and expansion are currently a baseline program of a +40,000 (gsf) new annex building and 9,000 (gsf) of renovations within the existing CUP, Department of Health Care Access and Information (HCAI) Level-1 utility space, diesel generators, electrical rooms and administrative support space to facilitate campus operations. This project will support the California Tower and other projects with site and building utility infrastructure upgrades. Scopes will be both HCAI and Non-HCAI. The CUP master plan and underground distribution is divided into three (3) phases, with the Central Utility Plant Expansion included in this project scope. o 48X Complex - Current project that consists of limited upgrades and extending utilities from the Central Plant to serve the 48X Complex only. Project is estimated to be completed by 2025. o Central Utility Plant Expansion - This project will expand the Central Plant capacity to support the California Tower and additional future projects. o Central Plant Modernization - Future project to expand the capabilities of the Central Plant by converting the Campus to an All-Electric operating Central Plant. The estimated total project Target Cost construction value is: $193,000,000.00. Target Costs for the Bid Packages listed below are the maximum amount Rudolph and Sletten Inc. and the University will spend on the project. Question Deadline 06/07/2024 at 10:00 AM PT This project is a public works project and is subject to prevailing wage rate laws (see Contract General Conditions, Article 35.02- c). All contractors and all tiers of subcontractors submitting proposals or bids on this project shall register to bid public works projects with the Department of Industrial Relations and maintain current this registration pursuant to Labor Code Section 1725.5. The CUP master plan and underground distribution is divided into three (3) phases, with the Central Utility Plant Expansion included in this project scope. 48X Complex - Current project that consists of limited upgrades and extending utilities from the Central Plant to serve the 48X Complex only. Project is estimated to be completed by 2025. Central Utility Plant Expansion – This project will expand the Central Plant capacity to support the California Tower and additional future projects. Central Plant Modernization - Future project to expand the capabilities of the Central Plant by converting the Campus to an All-Electric operating Central Plan PREQUALIFICATION QUESTIONNAIRE DUE DATE: 4:00 p.m., June 14 th, 2024

Post-Bid

Educational

$193,000,000.00

Public - State/Provincial

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
45
Bidding Soon
1,498
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

December 2, 2024

img_map_placeholder

To Be Determined, Sacramento, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.