BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Herriman, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Herriman City is seeking bids for its Juniper Canyon Recreation Area - Phase 2 project. Engineers Estimate is $350,000 - $380,000 This project includes but is not limited to: Asphalt paving of approximately 2400ft of the existing Juniper Canyon Trail, and construction of approximately 800ft of new asphalt trail and associated site work. Question Deadline 06/20/2024 at 5:00 PM MT All requests for interpretation of the Contract Documents shall be made in writing and delivered to the OWNER or ENGINEER no later than eleven (11) calendar days prior to opening of Bids. In the OWNER's or ENGINEER's discretion, OWNER or ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the OWNER or ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents. Herriman City will only consider bids for award of this contract from contractors who have performed the construction work on five similar projects since the year 2013. B. References or contact information for each of the five project's owners shall be included in the bid. The location of the work is in Herriman City at the following site: Section of trail connecting Juniper Canyon Park to trail above the dam, with bid alternate switchback trail connecting to Sky Ridge Park C. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. D. Meet all specific requirements of the plans and instructions included in this document For information about the award of this Construction Contract, contact Mr. John Nunley, Herriman City Project Engineer, 5355 West Herriman Main Street, Herriman, Utah 84096, (801) 446-5323, email jnunley@herriman.org. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$297,945.00

Public - City

Paving, Site Work

13

16

11

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
31
Bidding Soon
526
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

img_map_placeholder

4094 Autumn Spring Dr, Herriman, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.