Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 31, 2024 at 8:00 PM

Updated June 20, 2024

This is a service / maintenance or supply contract in Norlina, North Carolina. Contact the soliciting agency for additional information.

Contract Id 54-CA-05-PR7125 WBS: Various County: Warren - Division 5 Location: I-85 From the Vance County Line to the Virginia State Line Type of Work: Tree Trimming This contract is for tree trimming on I-85 in Warren County in Division 5. Tree trimming will be done on I-85 from the Vance county line to the Virginia state line. The Contractor is to provide all equipment, labor and material. At each site of operation, set up, maintain, and remove the appropriate traffic control devices. Conduct operations in a safe manner, adhering to all utility separation requirements. This is a Small Business Enterprise (SBE) Program project, and as such, it is restricted to businesses grossing less than $1,500,000, excluding materials, during the previous calendar year. As authorized by G.S. 136-28.10 (Highway Fund and Highway Trust Fund Small Project Bidding), the Departments normal bonding and licensing requirements are waived for this SBE project. The date of availability for this contract is July 1, 2024. The completion date for this contract is June 30, 2025. NCDOT - Tree Trimming - I-85

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
96
Bidding Soon
1,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 1, 2024

Project location map

I-85, Norlina, NC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed