Site work and new construction of a mixed-use development in Baldwin, Georgia. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; and water / sewer project.

For furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of the Baldwin WPCP - New Solids Handling Building in the City of Baldwin, Georgia. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. If a bidder is not selected within sixty (60) days of the bid opening, any bidder that is determined by the OWNER to be unlikely of being selected for contract award shall be released from their bid. The Project consists of, but is not limited to the following major elements: Construction of a new dewatering building, electrical, piping, grading and drainage installation of screw press supplied by owner and all other items incidental to the Project. Time of completion for all work associated with this project shall be three hundred sixty-five (365) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. OWNER requires a bid bond* or a certified cashier's check in the amount of five percent (5%) of the total bid to be enclosed with the bid at the time of bid opening. Cashier's check will be made payable to the City of Baldwin. The successful bidder will be required to furnish OWNER with Insurance, Workman's Compensation Insurance, and Performance and Payment Bonds* in the amount of one-hundred percent (100%) of the total bid. OWNER reserves the right to waive any informalities or to reject any or all Bids, to evaluate Bids, and to accept any Bid which in its opinion may be in the best interest of the OWNER. No Bid will be rejected without just cause. Successful Bidder will be required to perform WORK as the Prime Contractor. WORK performed by Prime Contractor shall be at a minimum 30% of the contract value. No BIDDER may withdraw his bid within the time limit specified in the Instruction to Bidders Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) For Performance Bonds less than $300,000 an irrevocable Letter of Credit from a bank as defined in O.C.G.A. Code Section 7-1-4 may be submitted in lieu of a bond. In lieu of a Payment Bond, a Cashier's Check, Certified Check, or Cash may be submitted in an amount not less than the total amount payable by the terms of the CONTRACT. Question Deadline 06/20/2024 Requestsfor clarifications or interpretation of the plans,specifications or other bid documents may be conveyed orally or in writing addressed to Engineering Management, Inc., 303 Swanson Drive, Lawrenceville, Georgia 30043 (Fax No. 770-962-8010), and to be given consideration, must be received at least seven (7) days prior to the date fixed for the opening of bids.

Bid Results

Municipal

$1,822,880.00

Public - City

New Construction, Site Work

31

21

15

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
55
Bidding Soon
1,501
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

To Be Determined, Baldwin, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.