Published July 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Moline, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

The general nature of the work is as follows Asphalt sealing and crack sealing of HMA pavement and playgrounds, restriping of parking lots, and repainting pavement markings of playgrounds PROJECT LOCATIONS: Bicentennial Elementary, Coolidge Facilities and Maintenance, Franklin Elementary, Hamilton Elementary, Jane Addams Elementary, Jefferson Early Learning Center, Lincoln Irving Elementary, Logan Elementary, Roosevelt Elementary, Washington Elementary, Willard Elementary, John Deer Middle, Wilson Middle, Moline High School, and Wharton Field House The work must commence no later than July 17, 2024, and must be completed no later than August 31, 2024. Any remaining work required after August 14, 2024, may only be completed after school hours or on the weekends and must be pre-approved by MCVSD. Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidder's security shall be in an amount equivalent to 10% of the bid amount, and shall be in the form of a cashier's or certified check drawn on a bank in Illinois or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Illinois or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. No bid may be withdrawn for a period of 30 days after the date of the scheduled closing time for the receipt of bids. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids. Questions should be in written form and emailed to Keith Karstens, Director of Facilities, 3432 Avenue of the Cities, Moline, Illinois 61265, kkarsten@molineschools.org.

Award

Sidewalks / Parking Lot

$122,640.00

Public - City

Paving, Site Work

24

6

6

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
49
Bidding Soon
736
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

July 17, 2024

img_map_placeholder

Multiple Locations, Moline, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

MCVSD Parking Lot & Playground Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.