BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

The objective of the project is to provide redundancy to the pipeline transmission system serving SFPUC's Stanford Heights Reservoir and improve water quality to pipelines at the end of the Sutro Reservoir pressure zone. The work to be performed under this contract includes the installation of 12-inch ductile iron pipe on Parnassus Ave. from Stanyan St. to 6th Ave., on 6th Ave. from Judah St. to Warren Dr., on Lawton St. from 7th Ave. to Funston Ave., on Funston St. from Lawton St. to Aloha Ave., on Aloha Ave. from Funston Ave. to 15th Ave., and 8-inch ductile iron pipe replacement on 11th Ave. from Kirkham St. to Lawton St., and on Kirkham St. from 6th Ave. to 7th Ave.. The work is to be performed in San Francisco, California. The Local Business Enterprise (LBE) subcontracting requirement is 14.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. The subcontractor participation requirement is set below 20% as this contract includes Contractor procurement of pipeline materials to be installed within the project limits. Pipeline procurement is through a non-LBE supplier and therefore reduces the overall LBE availability on this contract. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. Pre Bid Meeting Description: Attendance of remote attendees will be completed at the end of the pre-bid meeting. Micro and Small-LBE subcontracting participation breakdown: 5.10% MBE; 2.60% WBE; 6.30% OBE.

Post-Bid

Water / Sewer

$10,200,000.00

Public - City

Site Work

93

24

2

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
81
Bidding Soon
1,794
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.