BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Saratoga Springs, Utah. Completed plans call for site work for a water / sewer project.

Lining the inside of a number of sewer structures in Saratoga Springs. This will include the wet well for the Inlet Park Lift Station and the wet well for the Posey Lift Station using an approved cured-in-place (CIP) or fiberglass reinforced polyester panel (FRP) technology. This will also include lining between 5 and 25 manholes using an approved CIP technology. Bid security in the amount of 5% of the base bid will be required to accompany bids. Project construction dates are expected to be flexible. Anticipated construction completion date is no later than October 2, 2024. Question Deadline 06/11/2024 at 5:00 PM MT All questions relative to the project shall be submitted via the U3P application system. The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the OWNER. Only bids giving a firm quotation properly signed will be accepted. Furnish all labor, materials, equipment, and incidentals required to clean all gravity pipe as directed by the Owner and as specified herein. Cleaning shall include the proper high pressure water jetting, robotic cutters/grinders, and flushing of pipes and structures. Cleaning shall dislodge, transport, and remove all sludge, protruding lateral pipes (if any), mud, sand, gravel, rocks, bricks, grease, roots, sticks, and all other debris from the interior of the pipe and access structures. B. The goals of the cleaning is to remove all debris, roots, deposits, and intruding taps (if any), and all other blockages. If the pipe's condition is such that cleaning may compromise the structural integrity and/or cause a potential collapse, then no attempt shall be made to clean the pipe without approval of the Owner/Engineer

Bid Results

Water / Sewer

$442,844.00

Public - City

Site Work

15

13

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
537
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Saratoga Springs, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.