BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Foley, Alabama. Completed plans call for site work for a water / sewer project.

Sherman Road Drainage Improvements. One Hundred Fifty (150) Working Days Are Allowed for the Construction of the Project. Working Day (Daytime Work). Any Calendar Day From Midnight to Midnight, Exclusive of Saturdays and Legal Holidays (as Defined Herein), on Which the Contractor Could Proceed With Construction Operations for a Period of Six Hours or More With the Normal Working Forces Engaged in Performing Work on the Controlling Item or Items of Work, Which Normally Would Be in Progress at That Time, Will Be Classified as a Working Day. Saturdays and Legal Holidays on Which the Contractor Elects to Work for a Period of Four Hours or More Will Be Classified as a Working Day. All Bids Must Be on Blank Forms Provided in the Specifications With the Contract Booklet Submitted in Its Entirety. A Cashier's Check Drawn on an Alabama Bank or a Bidder's Bond, Payable to Baldwin County, Alabama, for an Amount Not Less Than Five Percent (5%) of the Amount Bid, but in No Event More Than Ten Thousand Dollars ($10,000) Shall Be Filed With the Proposal. The Bidder's Bond Shall Be Prepared on the Form Specified and Signed by a Bonding Company Authorized to Do Business in the State of Alabama. A Performance Bond in the Form and Terms Approved by the County in an Amount Not Less Than the Contract Price Will Be Required at the Signing of the Contract. A Labor and Materials Bond in the Form and Terms Approved by the County in an Amount Not Less Than 100 Percent (100%) of the Contract Price Insuring Payment for All Labor and Materials Shall Also Be Required at the Signing of the Contract. The Public Works Project Which is the Subject of This Invitation is Funded by the American Rescue Plan Act (Arpa), Along With Baldwin County Fiscal Year 2023 Funds. In Addition, the Contractor Must Furnish to the County, at the Time of the Signing of the Contract a Certificate of Insurance Coverage as Provided in the Specifications. The Right is Reserved to Reject Any and/or All Bids and to Waive Informalities or Irregularities and to Furnish Any Item of Material or Work, and to Change the Amount of Said Contract. Liquidated Damages for Non-completion of the Work Within the Time Limit Agreed Upon Will Be Assessed in Accordance With the Terms of the Contract. No bids will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified to submit a proposal for this construction in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license from the State Licensing Board for General Contractors, Montgomery, Alabama, as required by Chapter. 8 of Title 34 of the Code of Alabama (1975). In addition, non-residents of the State, if a corporation or any other entity, shall show evidence of having qualified with the Secretary of State to do business in the State of Alabama, if required by law. Out-of-state contractors must also comply with registration and surety bonding requirements as required by \c39-2-14 of the Code of Alabama (1975). No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of the County Commission of Baldwin County, Alabama.

Bid Results

Water / Sewer

$1,294,544.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
40
Bidding Soon
487
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 29, 2024

img_map_placeholder

Sherman Rd, Foley, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.