BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Charlton, Massachusetts. Completed plans call for site work for a water / sewer project.

The U.S. Army Corps of Engineers New England District is issuing a Solicitation Notice for Seasonal Public Water Supply Well Installation, Buffumville Lake, Charlton, MA. THE WORK CONSISTS OF: The contractor shall provide all labor, materials, and equipment necessary to install a new seasonal public water supply well. The contractor is responsible for submitting and obtaining all permit applications with the Massachusetts Department of Environmental Protection (Mass DEP). All work shall be performed in accordance with the Statement of Work. Location: Buffumville Lake Park is located at 229 Oxford Rd. in Charlton, MA 01507. See the attached photos for more information. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 237110 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. Curb stop with water shut-off to host sites. Buried 6" below grade. Curb stop is located 25r from edge of asphalt and 62T from edge of grove staircase. 2. Union between two segments of 1 " blue waterline, joined by a bronze fitting. Buried 5.5' below grade. 3. Electrical junction box containing power lines to octagonal shelter, storage barn, and pump house. 4. New 1" blue waterline extending from storage bam (5) to curb stop riser (1). 5. Water intake to storage barn holding tank. New 1" blue water line buried approximately 2r below gravel lot. 6. Cement junction cylinder with water shut-off. Connects pump house lines to picnic grove junctions. Capped by cement slab. 7. Pump house waterline meets T-junction, connecting to two curb stop risers. Riser closest to parking lot is a shut-off for host sites. Riser closest to restrooms is a shut-off for the restrooms. Risers are located 177r from edge of asphalt and are buried approximately 5' below grade.8. Breaker box and electrical panel. Electric lines run between octagonal shelter (8) and electrical junction box (3). 9. Electrical junction box containing power lines I from electrical junction box (3) running to storage bam (5). MBE (1.6%), WBE (6.9%), SBE (100%)

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Site Work

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
183
Bidding Soon
3,328
All Active Projects
1,331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

August 2, 2024

img_map_placeholder

229 Oxford Rd, Charlton, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.