Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2024 at 8:00 PM
Updated August 16, 2024
Site work and renovation of a civil project in Alton, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of August 15, 2024, project was awarded to Young's General Contracting, Inc., awarded amount is $1,58,503.75.** Contract #1 - Wastewater Treatment Facility Rehabilitation including influent flow measurement and screening, Oxidation Ditch and Clarification equipment replacement, UV Disinfection, and other necessary appurtenances for a fully operational wastewater treatment system. Contract #2 - Collection System Improvements including manhole lining and repairs, gravity sewer main cured-in-place lining and repairs, sewer wye testing and grouting, and other appurtenances for fully operational collection system improvements. Est. Value: $ 4,000,000.00 Est. Value Notes: Combined estimated value for both contracts Est. Completion Date: Sept. 1, 2025 Site Directions: Courthouse Square Site Address: 3 Court Square Cementitious Crystalline Waterproofing: Blend of Portland cement, fine treated silica sand and active proprietary chemicals. When mixed with water and applied as a cementitious coating, the active chemicals cause a catalytic reaction which generates a non-soluble crystalline formation of dendritic fibers within the pores and capillary tracts of concrete. This process causes suitably dense concrete to become permanently sealed against the penetration of liquids from any direction.
Award
Water / Sewer
$1,538,504.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
September 10, 2024
3 Court Sq, Alton, MO
Related To This Project
Alton, MO
Bid Date: Nov 21 2024
Alton, MO
Bid Date: Feb 20 2025
Alton, MO
Bid Date: Mar 13 2025
Alton, MO
Bid Date: Jul 03 2025
Alton, MO
--
Alton, MO
--
Alton, MO
Bid Date: May 17 2024
Alton, MO
Bid Date: Dec 17 2021
Alton, MO
Bid Date: Aug 18 2023
Alton, MO
Bid Date: Feb 23 2022
Alton, MO
Bid Date: May 08 2023
Alton, MO
Bid Date: Feb 17 2023
Alton, MO
Bid Date: Jul 15 2022
Alton, MO
Bid Date: May 09 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
